"Brady and his crew did a fantastic job! We love our new driveway and will definitely be calling him again for more concrete work. Highly recommend Brady’s Concrete and Construction!"
"Contacting them after seeing their ad in the Angie's List magazine. John was great to work with and he and the team did a great job. Consulted with me throughout the entire process and we're very happy with the result. Leveled and graded our backyard (~4,000 feet) and laid new sod."
"Great Job! Happy with the work that was done on this project. Bravos Flatwork did more than just pour concrete, work including Bobcat work preparing the sight and re landscaping the area when the concrete was complete."
"Wanted to wait to see how things settled/ weathered, prior to writing a review. They were very nice and professional, cleaned the edges of the driveway, and put a thin layer of sealant on. Looked great at first, but over time (six months ) wore down .... maybe it needs to be an annual thing, or they should put two coats on. "
"In Spring 2012, we obtained quotes from three companies to tear out two existing retaining walls along the driveway and re-build them using Versalok, excavate and grade the backyard, and build a 3.5 - 4 foot retaining wall in the backyard using the stone from the old retaining walls. Genadek had the middle quote; they were also the only company to follow up with a phone call. The whole job took about 4 1/2 weeks. Stan, Mike, Tim, Rob and Andrew were very professional and friendly; our neighbors even raved about them. They cleaned up the job site at the end of each day and communicated frequently so there were no surprises. My only recommendation to those interested in hiring Genadek is to get on their schedule early. Their calendar books up fast! "
"Due to a family emergency, my husband and I decided to sell our house this year. We asked Justin to come over and walk through the house with us and give his opinion on things that should be done before putting it up for sale. He gave us a reasonable quote, and let us decide what we wanted him to do, and what we thought we could tackle ourselves. He knew our goal, and wanted to make sure we got what we wanted and were satisfied. Justin and his crew painted the main living areas of the inside of the house (walls and ceiling), remodeled the main floor bathroom, fixed and repainted some siding around the house, and poured a cement apron and re-sealed the driveway. He was always in contact with us on the progress of the projects (as we had already moved out). If we had questions or concerns, he would respond quickly. As many times as we contacted him, he was always very nice and professional."
"They did a beautiful job. It was spendy. It was a lot because it was all cedar and it was kind of custom done. It is very pretty. Their pricing was not inexpensive, but I think the quality of their work and the value were there."
"Project Manager Curt did a great job making sure materials and people were delivered on time and ready to work. The roofing crew was great. Curt drove down on a snowy January day to address a concern, fully explaining why I was seeing what I was seeing. When snow melts and the shingles warm, the issue should resolve itself without any intervention necessary. They have a good warranty, and Curt was very clear about rectifying any problems that may show up. I believe him."
Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.
Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.
Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.
It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting.
Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.
The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.
The Le Sueur, MN homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.