Top-rated excavation pros.

Get matched with top excavation pros in Westland, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Westland, MI?

Select your specific project to find the pro for you.

TRUSTED BY WESTLAND, MI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon29
    Verified excavation services reviews

Find Excavation pros in Westland

RPM Excavation, LLC
4.2(
156
)
Landscape - Minor Grading or ReslopingExcavation - Major Grading or Resloping - For Business

Serving Westland, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2017

Free estimates

Small jobs welcome

"Customer service with this company was exceptional, this company goes above and beyond. Was very pleased with their work with their workers and with the owner of the company, I couldn’t have asked for a better company would highly recommend them to anyone who is in need of any excavation work."
Response time12 hrs
Response rate92%
18 neighbors recently requested a quote
...
Showing 1-10 of 201
Excavating questions, answered by experts

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

Water lines are buried at various depths, depending on the type of line. For example, most sprinkler lines are buried between four and 12 inches underground. On the other hand, water mains usually sit between one and 3 feet below ground. However, they can go even deeper in cold climates to prevent freezing.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

If you’re planning to dig on your property, you’ll need to check for underground utility lines. Call the national call-before-you-dig 811 number. Once connected to an operator, you can schedule a site visit to mark underground lines. This way, you won’t accidentally dig into pipes and can cause major (read: costly) issues.

The Westland, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.