Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Sandusky, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Sandusky, MI?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Sandusky

Avatar for WELCH TILE & MARBLE
WELCH TILE & MARBLE
4.9(
11
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Sandusky, MI and surrounding areas

In business since 1987

Free estimates

Credit card accepted

"Brady came and gave me an estimate.  They were able to start the work the next day.  It went quite well.  They ran into a slight problem in that some of the sub floor came up with the tile.  But it did not result in much of a price increase.  The floor was extremely uneven, but after they were finished, it was even and ready for us to install our floating floor.  They did a great job.
"
Recommended by100%of homeowners
Showing 1-10 of 28
Epoxy Flooring questions, answered by experts

How do I epoxy a garage floor?

To epoxy a garage floor, you need to measure the area of the floor, remove all items from the garage, thoroughly clean the floor, and then follow the manufacturer’s instructions to mix and apply the epoxy. Learning how to epoxy a garage floor can save you between $4 and $7 per square foot on labor.

Most concrete sealers take about one to three hours to dry. However, those that penetrate may take up to 48 hours or more to completely dry. You can find specific drying details from the manufacturer on the label.

Yes, with textures, colors, and finishes available to match décor.

If you want to ensure your concrete sealer is applied correctly and lasts for as long as possible, hiring a professional is a good idea. A pro can recommend the ideal sealer and ensure it’s applied correctly.

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

The Sandusky, MI homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.