Top-rated basement remodelers.

Get matched with top basement remodelers in Jones, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Jones, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Jones

Avatar for Brawny Builders
Brawny Builders
4.8(
35
)
Basement - Remodel

Serving Jones, MI and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"Brawny Builders was great on all accounts. They helped with the design of our project which included a new front entrance, large rear deck, a couple sections of fence and an outdoor shower. They had a competitive quote and we’re able to start quickly. Their crew was hard working, very courteous and customer focused. The project was completed within the agreed timeframe and slightly under budget. The best thing about working with Brawny Builders was their effectiveness in communicating with me about all phases of the project. We’ve worked with many contractors over our years and no one comes to Brawny Builders in their customer relations. I would definitely use them again and highly recommend them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by93%of homeowners
Avatar for Precision Interior Exterior LLC
Precision Interior Exterior LLC
5.0(
4
)
Basement - Remodel

Serving Jones, MI and surrounding areas

Free estimates

"Precision Interior was very professional and got this job done very quickly. This was time sensitive and they didn't disappoint. I would recommend them to anyone needing work done around their house or business."
Remodeling - General Project
Handymen Project
Roofing Project
Handymen Project
Roofing Project

+23

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Jones, MI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 22
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Since DIYing a basement remodel isn't typically advised, there are some ways that you can still save money on this project without putting yourself in danger. Some ways to save money on a basement remodel include:

  • Painting walls yourself versus including in the cost of the remodel 

  • Installing light fixtures yourself

  • Choosing prefabricated fixtures, like cabinets, over custom ones

  • Choosing a budget-friendly flooring option, like laminate or vinyl flooring, and add rugs where necessary

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

The Jones, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.