Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Benzonia, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Benzonia, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Benzonia

Greener Earth Landscaping, LLC
4.7(
23
)
Interlocking Pavers for Driveways & Floors - Install

Serving Benzonia, MI and surrounding areas

Approved

In business since 2015

Free estimates

Warranties offered

"Most reasonable bid made among three for retaining wall, aggregate spread on drive, and loose-layering of steppers for garden. I appreciated that Chad incorporated some of my creative ideas. He fit this minor project in between two immense ones-- I waited 5 weeks, less than expected. Ted and Carlos worked steadily and hard. I appreciated their updates when I inquired about progress as they labored on."
Main entry
Stepsd
Below Damn
Top of damn
above damn

+27

Response time1 day
Response rate85%
15 neighbors recently requested a quote
PENINSULA PAVERS
4.4(
5
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+3 more

Serving Benzonia, MI and surrounding areas

In business since 1994

Free estimates

Credit card accepted

"The price was fair. When they originally came to do it, there was not enough road gravel down so we had to have the other guy come back and redo that. We kept getting a promise date and then they wouldn't show. It took a while to get them back so we were a little disappointed with them. We couldn't reach them. We would leave messages and they wouldn't call back. Since we missed our first opportunity, then we got pushed back and they took care of the other places. They should have responded and let us know. When they finally did come the crew was great and the finished product was good. The pricing was in the ballpark. This was set up through our contractor. They did finally come when they said but it took 3 times. We might look for somebody else in the future."
Recommended by75%of homeowners
Avatar for TNT Outdoor Services LLC
TNT Outdoor Services LLC
3.2(
12
)
Brick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Benzonia, MI and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"It wasn't good. They were repairing a wall and he dug it out, but when he put it back up it was the used blocks that he was putting back up and he didn't pay any attention to how he was doing it. He had a couple of his kids helping and he put them, one had cement from the previous original job and he put that facing up instead of using the blocks that were on top as the top. And some of them were broken and he just put them back in and there wasn't enough and he couldn't find anything to use additionally to fill in for the ones that were missing and I'm not sure if it was quite as straight as it should be but it's in place well enough to be effective."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+25

Recommended by27%of homeowners
Showing 1-10 of 49
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

Depending on project size, typically 1 to 3 days, including preparation and installation.

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

The Benzonia, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.