Top-rated subcontractors.

Get matched with top subcontractors in Allendale, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Allendale, MI?

Select your specific project to find the pro for you.

TRUSTED BY ALLENDALE, MI HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon1k+
    Verified subcontracting services reviews

Find Subcontractors in Allendale

Avatar for New Image Remodeling
New Image Remodeling
4.9(
128
)

Serving Allendale, MI and surrounding areas

Approved

In business since 1991

Free estimates

Warranties offered

"These guys were great! Clean work, clean jobsite all throughout the project, completed on time and on budget! Great attention to detail. Awesome communication the entire time. Would absolutely recommend their work. 10/10"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Response time3 days
20 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for H & B CONSTRUCTION, LLC
H & B CONSTRUCTION, LLC
4.9(
17
)

Serving Allendale, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Small jobs welcome

"We highly recommend H&B construction! Matt and KJ were great to work with and did an exceptional job rebuilding our deck. They went above and beyond our expectations, their craftsmanship and attention to detail is outstanding. We are enjoying using our new composite deck, and will definitely use H&B construction for future projects. Thanks Matt & KJ!"
Response time1 day
4 neighbors recently requested a quote
Recommended by81%of homeowners
Top Home Improvements, LLC
4.9(
30
)

Serving Allendale, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"The installation crew was polite and professional. They worked efficiently and took careful effort to contain any dust and dirt. The completed project looks nicer than we expected. The caulk lines are straight and not excessive. We are very pleased with your work."
Happy customers!
Happy!
Response time1 day
Response rate100%
98 neighbors recently requested a quote
Avatar for Groundworks
Groundworks
4.6(
43
)

Serving Allendale, MI and surrounding areas

Approved (Corporate)

In business since 2007

Free estimates

Warranties offered

"the house sold before the work was needed. Forrest was patient and easy to understand while explaining the whole process. I have used FSM for other basement work and would recommend them. Thanks again"
Crawl Space
Crawl Space
Crawl Space
Crawl Space
Crawl Space

+16

73 neighbors recently requested a quote
Recommended by78%of homeowners
Avatar for Five Star Bath, Inc - Grand Rapids
Five Star Bath, Inc - Grand Rapids
4.5(
131
)

Serving Allendale, MI and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"This was just looking at the situation, presenting options, then we made the agreement. So we can't comment on work yet, but the first stage was very well done."
Gilbert Before
Gilbert Bath
Curtis Bath
Geraldine
Response time2 hrs
Response rate100%
53 neighbors recently requested a quote
...
Showing 1-10 of 275
Subcontractors questions, answered by experts

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

Dekton is worth the money for homeowners who want a nonporous countertop that resists heat, stains, water, scratches, and UV damage. It comes in a wide array of colors and patterns at various price points to suit different renovation budgets. Dekton is not worth the cost for homeowners who are particularly worried about chipping or cracking.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The Allendale, MI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"