Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Maugansville, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Maugansville, MD?

Select your specific project to find the pro for you.

TRUSTED BY MAUGANSVILLE, MD HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon73
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Maugansville

Avatar for JD & Sons Masonry and Concrete
JD & Sons Masonry and Concrete
4.7(
7
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Maugansville, MD and surrounding areas

Approved

Super Service Award Winner

Customers say: True professional

"Jeff and his crew were great to work with. The porch looks amazing!! They poured footers, built block walls, filled in around the walls, poured and finished the concrete porch and stairs. I would definitely hire them again!!!"
Stone veneer
Concrete flat work
Stone veneer
Concrete flat work
Stone veneer

+34

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Cutting-Edge Contracting
Cutting-Edge Contracting
5.0(
3
)
Concrete Driveways & Floors - Install- For Business

Serving Maugansville, MD and surrounding areas

Approved

In business since 2024

Free estimates

Small jobs welcome

With over a decade of experience, CUTTING-EDGE CONTRACTING LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Response time2 days
Response rate100%
Avatar for Stampcrete of Maryland, Inc.
Stampcrete of Maryland, Inc.
4.5(
30
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving Maugansville, MD and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"The work was done well overall, but I had to remove some large concrete pieces from the sloping areas around the edges. The original diggers had buried these close to the surface, which would have made landscaping impossible. This was not Jerry's fault, as they did not follow his instructions to break these up, and add them to the substrate rock under the patio base. There were delays due to the very bad weather, out of his control, but the re-scheduling needs could have been communicated better, in my opinion."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by95%of homeowners
...
Showing 1-10 of 113
Asphalt Driveways questions, answered by experts

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Sometimes, when people talk about asphalt driveways, they’re actually referring to asphalt concrete, which is a completely different compound. Asphalt concrete is asphaltic cement combined with sand or grit. It is significantly more lasting and durable than regular asphalt but also much more expensive. If you’re considering using asphalt concrete, ask an asphalt company for their expert opinions.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Maugansville, MD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.