Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Randolph, MA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Randolph, MA?

Select your specific project to find the pro for you.

TRUSTED BY RANDOLPH, MA HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon236
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Randolph

O'Donnell Pools, Inc.
4.0(
125
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Randolph, MA and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"My original contract with O Donnell Pools was 2 years ago to have them remove all tiles, resurface and paint my gunite pool and install all new tiling. When they completed the work the 25 year old pool looked brand new. I then contracted with them for opening, closing and weekly service and have been extremely pleased with the services provided."
Response time20 mins
Recommended by94%of homeowners
Ranieri Construction Inc
4.6(
84
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Randolph, MA and surrounding areas

In business since 1973

Free estimates

Emergency services offered

"We called Ranieri Construction because a combination of ground settling and a sloppy repair made our concrete pool deck not only cracked and uneven, but also unsightly. Lou Ranieri explained that they couldn’t fix the cracks as they were, but would have to remove the filler from the first repair, grind down the uneven surfaces and stain the whole surface to achieve an even color. Once the plan was in motion, Andrew Ranieri worked tirelessly to grind down and level all the surfaces – this man is a definite perfectionist and the even surface is better than we ever thought was possible. A skim coat was applied and, once hardened, the whole area was cleaned and stained. It’s beautiful! We can’t say enough about how diligent Lou and Andrew are in their, often backbreaking, work. Once completed, the work area was left spotlessly clean. This is the type of company all should strive to be – a company where work ethic, integrity and the correct way of solving a problem are paramount. Thank you, Ranieri Construction! You're the best!"
Recommended by97%of homeowners
Avatar for MCM POOL SERVICE, INC.
MCM POOL SERVICE, INC.
4.4(
16
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Randolph, MA and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"Generally I do not write many reviews, but when I do its because a company exceeded my expectations. Hi my name Dave from Cumberland RI.I had a major problem with my pool when removing the cover I dumped all the dirt and leaves right into it, literally it looked like a polluted swamp. I Called MCM pools June 24th along with several other companies for a clean up, MCM was the only company that called me back.I received a call from Alec, explained my situation and within minuets he designed a plan that allowed our family to be swimming in a clear beautiful pool before the 4th of July. People are quick to bash when they perceive poor service or price gouging. MCM pools far exceeded my expectations with the service they provided but more importantly the communication with managers like Alec who was not only knowledgeable but personable and engaging. I been a customer literally 10 days and had 3 or more phone conversations with him which says a lot. Bottom line This company wants to earn your business and tries to exceed expectations, im old school and don't impress easily or expect much, but MCM pools more than met the challenge.."
Response time1 day
Recommended by100%of homeowners
The Pool Installers.com
3.2(
24
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Randolph, MA and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Nesto did a great job installing an above ground pool for me in the Fall of 2015. From excavation to final assembly, all went as planned. I couldn't be happier. Nesto is also a really cool guy, I highly recommend his services!"
Response time1 day
Recommended by100%of homeowners
Showing 1-10 of 39
Install Above Ground Pools questions, answered by experts

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

Generally, you should run your pool pump for eight to 12 hours a day to keep your water clean and chemical levels balanced. The ideal runtime can vary depending on your specific pump type. While running the pump as much as possible is ideal for cleanliness, it can increase electricity costs. To save money, you can run the pump strategically during non-peak hours when electricity is cheaper, which is often in the evenings or at night. The hours do not need to be consecutive.

Off-season pool-building prices often align with the time of year you're least likely to use a pool. Many contractors offer deals in the late fall and winter to bolster the slow time of year. However, if you live in an area with freezing winters, you'll need to wait beyond the final frost and threats of extreme weather.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes. A pool pH too high may result in a rash, red, or stinging eyes for swimmers. It means chlorine isn't as abundant as it needs to be to neutralize germs. A pH that is too low means the water is too acidic, which can cause similar bodily irritation and damage to your pool's lining and the surrounding plaster, stone, or tile.

The Randolph, MA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.