Top-rated basement remodelers.

Get matched with top basement remodelers in Goshen, MA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Goshen, MA?

Select your specific project to find the pro for you.

TRUSTED BY GOSHEN, MA HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon10
    Verified basement remodels reviews

Find Basement remodelers in Goshen

Avatar for RATTIGAN & Sons
RATTIGAN & Sons
4.1(
166
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

Approved

In business since 2019

Free estimates

Emergency services offered

"Rattigan & Sons are amazing! At least 11 out of 5 stars! The quality of their work is exceptional and they use the highest quality building materials! Everyone with Rattigan & Sons are top of the line experts! I can’t easily describe how happy I am that Rattigan & Sons remodeled my kichen and how much I love everything about my new kitchen and how perfect it turned out! Sean Rattigan is incredible! He’s so smart and expert at every aspect of construction and he’s amazing to work with! He’s super thoughtful, down to earth, nice, funny guy and he will straight talk and tell you how it is. He’s fantastic to communicate with and he’s a true dog lover! I have 3 pups and they love Sean! The craftsmanship and experience of Rattigan & Sons is excellent beyond anything I ever could have imagined! The cabinets and countertops are the absolutely highest quality! Everything was installed perfectly! I feel so much joy every time I walk into my new kitchen! It is a true masterwork!"
Landscaping project
Additional photos
Additional photos
Additional photos
Additional photos

+21

Response time12 hrs
Response rate100%
15 neighbors recently requested a quote
Sonart Construction Corp.
2.3(
7
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

Sonart Construction Corp. has over15 years of experience in providing a variety of exterior and interior renovation services. We provide services to Palm Beach, Broward and Miami-Dade Counties.. We specialize in Bathroom Remodeling, Kitchen Remodeling, Flooring and the list goes on. Customer satisfaction is what determines our success, which is why we take a hands-on approach and keep the customer informed through every phase of the project. When interacting with our company, you'll notice that we're particularly focused on the principles of quality workmanship, timely completion, competitive pricing, and integrity in all our business dealings. We combine knowledge and research with our extensive practical experience to ensure a specialized approach for your renovation needs. Give us a call today!

Pavia Construction
2.8(
2
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

Approved

In business since 1965

Free estimates

Customers say: Quick response

"My wife and I couldn't have been happier with the quality of work performed by Pavia Construction. The tiling work and designs were excellent. We chose a color scheme & asked they be creative. The live-edge wood vanity with stone vessel sink with bamboo-style faucet off-set is really stunning! Couldn't have asked for anything better!"
 game room
 Busy Bob :-)
 Happy Customer
 Marble Bathroom
 Marble Hot Tub

+13

1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for The BullBag
The BullBag
5.0(
15
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

In business since 2001

Credit card accepted

"I have now had 4 pickups from this company. Each time it has been with different items: I have had my kitchen remodeled,  a deck torn down and rebuilt, a new roof put on, old fencing disc arded, and a yard cleanup. The only difference in pricing was for the roofing and even though ti was more money it was STILL CHEAPER than a dumpster!!! I don't know how these guys do it, but they pickup on time, without issue andfor the cost quoted. I have turned each of my contractors onto them - now they are using them. SO MUCH cheaper and better service than any dumpster company I have used!"
The BullBag truck in MA
The BullBag truck in NY
Toys for Tots
Recommended by100%of homeowners
Avatar for Home Facelifters
Home Facelifters
4.5(
31
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

In business since 1999

Free estimates

Credit card accepted

"Everything went great, there were a couple changes that had to be made as the job progressed, we found out the old toilet had been leaking pretty badly, and there was a bunch of rotting floor boards.  Other than that they completed the job within our time frame, cleaned the house up at the end of each day very well, and really treated our home like it was theirs.  Everything was sealed up with plastic barriers so we wouldn't get dust throughout the house, I was very pleased about that.  We plan to have them back in the next year or two for the kitchen.
"
Kitchen Before
Kitchen After
Front of house after
Recommended by96%of homeowners
Avatar for SURGE HOME CONCEPTS, LLC.
SURGE HOME CONCEPTS, LLC.
4.2(
21
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

In business since 2016

Free estimates

"Dave and his crew came in and were very professional from start to finish. They were very meticulous with the installation of the new cabinets, and the granite countertop was handled with care and placed perfectly with ease. The crew were very hardworking, and even replaced some rot they had found without elongating the time frame Dave had estimated, which was great. Already spoke with him about further remodeling and am definitely hiring him for doing so. Thank you Dave and crew, my wife and I are extremely satisfied with your work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+92

Recommended by88%of homeowners
Avatar for RATTIGAN & Sons Inc. DBA THE HOME IMPROVEMENT SPECIALISTS
RATTIGAN & Sons Inc. DBA THE HOME IMPROVEMENT SPECIALISTS
4.1(
81
)
Basement - Remodel

Serving Goshen, MA and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Amazing!!! Andrea, her lead contractor Sean, and his team did a great job remodeling my basement. They were very patient in explaining everything to me in detail and made sure I was a 100% happy with the remodel. They were punctual and always cleaned up after they were finished. I have nothing but good things to say about this company and there work. I will be rehiring them to landscape my property this up coming spring."
Landscaping Project
Kitchen and Bath Remodeling Project
Remodeling - General Project
Kitchen and Bath Remodeling Project
Remodeling - General Project

+63

Recommended by84%of homeowners
Showing 1-10 of 47
Basement Remodel questions, answered by experts

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

The Goshen, MA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.