Top-rated basement remodelers.

Get matched with top basement remodelers in Smithland, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Smithland, KY?

Select your specific project to find the pro for you.

Find Basement remodelers in Smithland

Avatar for The Shelby Touch LLC
The Shelby Touch LLC
5.0(
3
)
Basement - Remodel

Serving Smithland, KY and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"I called Grant. He looked over my project. Told me what he could do for me. He did some Masonary work. He repaired some old plumbing for me. He did such a great job that I called him back for a Painting job as well. He painted my cathedral ceiling and did an excellent job! He was prompt and his communication with me with spot on. I will certainly use him again., Grant is awesome!"
Bathroom Remodels
Bathroom Remodels
Bathroom Remodels
Bathroom Remodels
Bathroom Remodels

+4

14 neighbors recently requested a quote
Avatar for Elite Installation Services LLC
Elite Installation Services LLC
4.5(
8
)
Basement - Remodel

Serving Smithland, KY and surrounding areas

In business since 2013

Free estimates

Warranties offered

"The installation crew was awesome. They were very professional and friendly. The installers took pride in their work. They insured that all 19 windows were installed properly and left a clean work site. I recommend Elite installation Services."
Simon Project
Simon Project
Simon Project
Simon Project
Simon Project

+30

Recommended by87%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Smithland, KY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Precision Landscape & Remodeling
3.7(
13
)
Basement - Remodel

Serving Smithland, KY and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Everything this company did from the initial point of contact to the finalization of the project we were happy me and my wife had a 35ft wide by 20 ft long and bout 4ft deep center pond put in on our property. From the price of the pond it's self to the way they ran there skidsteers they did an amazing job they handle there's self in a professional and great manner the whole time I would these guys every time matter of fact I have them coming out to do siding."
Front of house
Side of house
Front bed
Front house bed with fence and custom brick
Custom 8x8 grill platform

+12

Response time2 days
Recommended by62%of homeowners
Josh Hemphill Concrete & Construction - Home Facebook
5.0(
2
)
Basement - Remodel

Serving Smithland, KY and surrounding areas

In business since 2008

Free estimates

Josh Hemphill Construction proudly serves its customers with over 25 years of experience. Every project we engage is done with pride, integrity, and attention to the details that matter most to you. This is one of the many things that sets us apart from the rest. We are locally owned and operated. Give us a call today, we look forward to earning your business!

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 39
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Since DIYing a basement remodel isn't typically advised, there are some ways that you can still save money on this project without putting yourself in danger. Some ways to save money on a basement remodel include:

  • Painting walls yourself versus including in the cost of the remodel 

  • Installing light fixtures yourself

  • Choosing prefabricated fixtures, like cabinets, over custom ones

  • Choosing a budget-friendly flooring option, like laminate or vinyl flooring, and add rugs where necessary

The Smithland, KY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.