Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Walton, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Walton, IN?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Walton

Avatar for RS SURFACE COATINGS
RS SURFACE COATINGS
5.0(
17
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Walton, IN and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Credit card accepted

"The RS team showed up with less than one week notice and were able to fit my project in between some others they had going on. I needed some tile replaced in my shower, and they were willing to help. The job took them about 5 hours and the results were amazing. 10/10, would recommend to anyone needing work done! They were professional, timely, and descriptive with their repairs. I will be using them again in the future!"
Domino flake
Domino flake
Domino flake
Domino flakes
before flake system

+31

Response time3 hrs
Response rate97%
6 neighbors recently requested a quote
Avatar for Superior Bath System
Superior Bath System
4.4(
70
)
Tile: Ceramic and Porcelain - Install

Serving Walton, IN and surrounding areas

Approved

In business since 2002

Free estimates

Warranties offered

"Redesigning & replacing your shower can certainly be an overwhelming process, Superior Bath Systems eliminates all of that. Their communication from setting up the initial appointment through final install was impressive, kudos to Carrie. During the in-home consultation, all options are brought to you and your design is built while on-site. John, our in-home sales consultant, was thoughtful & thorough in his approach. Come to install, David was professional, timely and immensely skilled. Cannot say enough about this group, outside of thank you."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+73

Response time11 hrs
Response rate100%
51 neighbors recently requested a quote
Patrick Brothers Flooring and Trim LLP
5.0(
8
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Walton, IN and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"The Patrick Brothers from start to finish was a top notch experience. They were clean, addressed concerns with subfloor, and went above and beyond to make sure we were satisfied with the work performed. After the initial project I hired them to fix another job that they did not do and did an excellent job. I would highly recommend their services."
Ceramic Tile Job Argos, IN
Ceramic Tile Job Mishawaka, IN
Ceramic Tile Job Plymouth, IN
Ceramic Tile Job Plymouth, IN
Ceramic Tile Job Plymouth, IN

+8

Response time3 hrs
Recommended by100%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Walton, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Abbott Stone and Tile
4.3(
6
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Walton, IN and surrounding areas

In business since 1996

Free estimates

Credit card accepted

"Abbott Stone and Tile did an amazing job of installing glass and stone tile on the wall between our set of floating shelves. It looks incredibly beautiful and they worked efficiently, finishing the job in less time than I would have guessed. Dave Abbott does not pawn off his work to less-skilled others; he wants the end-product to look fantastic and he assures that by maintaining a very high standard. And it was a great deal for the money! Thank you Abbott Stone and Tile!!!"
Recommended by33%of homeowners
...
Showing 1-10 of 55
Ceramic Tile questions, answered by experts

Larger tiles can be difficult to install because they’re heavier and bulkier than their smaller counterparts, which makes them harder to haul around and put in place. Plus, if you don’t install the tiles correctly, they could crack or break. For these reasons, it’s best to hire a professional for large-format tile installation.

There are several tools that you will use together to install tiles. Four of the most basic tools needed in tile installation include a notched trowel for applying tile adhesive, a tile cutter or saw for cutting tiles to size, tile spacers for creating the appropriate amount of space between tiles, and a grout float for applying grout.

Yes, provided you aren’t installing drywall over it. But you can skim coat it, apply new tile right on top, paint it, or stencil it. For more budget- and DIY-friendly options, you can install beadboard or apply decals. Just make sure that the current tiles are in good condition and prepped well for the paint or adhesive to stick.

Porcelain countertops have a fairly long life span, sometimes lasting for decades. Depending on how much wear and tear you put your countertops through, it could last 25 to 50 years. But be warned, porcelain is also prone to cracking, so as long as you take good care of it, you’ll have those countertops looking brand new for years to come.

If you want your ceramic tiles to be evenly spaced and installation to take less time, spacers are a crucial part of the installation process.

The Walton, IN homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.