Top-rated asphalt driveway pros.

Best asphalt driveway pros near Spiceland, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Spiceland, IN?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Spiceland - Updated Nov 2026

Central Paving of Indianapolis, LLC
4.2(
246
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Paving - Install- For Business

Serving Spiceland, IN and surrounding areas

Approved

In business since 1983

Free estimates

Emergency services offered

"William was great to work with! The driveway looks great! They got me on the schedule in a timely manner even with all the rain that we have had lately. If you want a quality job by a quality company this is it."
Response time3 days
6 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Precision Sealcoating & Lawn Care
Precision Sealcoating & Lawn Care
4.4(
8
)
Asphalt Sealing

Serving Spiceland, IN and surrounding areas

Approved

In business since 2021

Free estimates

Offers commercial services

"Precision Sealcoating did an excellent job on the driveway! Brandon Payne was very meticulous in his work and made the asphalt look brand new. I’m so happy with the work he did"
Driveway Sealcoat
35 neighbors recently requested a quote
Recommended by85%of homeowners
...
Showing 1-10 of 187
Asphalt Driveways FAQs, answered by experts

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Cobblestone is just one of many driveway materials. Other, more economical, albeit less elaborate options include concrete, asphalt, and gravel. 

If you want a material that most closely resembles cobblestone, your best option is bricks or pavers. Both cost anywhere from $10 to $50 per square foot and can be laid in all kinds of patterns. Depending on the type of paver you choose, you can also get a good bang for your buck by investing in durable natural stone.

The Spiceland, IN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.