Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Le Mars, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Le Mars, IA?

Select your specific project to find the pro for you.

TRUSTED BY LE MARS, IA HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon24
    Verified backsplash installation services reviews

Find Backsplash installation pros in Le Mars

Dave Navarro Construction
5.0(
2
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Le Mars, IA and surrounding areas

In business since 2010

Free estimates

We are a General contracting company. We perform all services involved in the completion of unfinished space. We do hire sub contractors when needed. We also stand by their work as well. Though we have only been in buisness for a short time. we have a combined 37 years construction experience.

Recommended by100%of homeowners
R & R Install
New to Angi
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Le Mars, IA and surrounding areas

In business since 2002

Free estimates

Credit card accepted

Rodney Plum and R & R Install have been serving the Sioux City area for the past 8 years. Specializing in Carpet Installs, Rodney and his install crew havw a combined work experince of over 25 years. So give Rod and R&R a call today!!

Showing 1-10 of 15
Backsplash Installation questions, answered by experts

A cement backer board is not needed for laying tile on concrete. Sometimes referred to as a cementitious backer unit, or CBU, backer board should be used if the subfloor is plywood or OSB. The backer board provides a base on which to install the tiles that isn’t as likely to be damaged by any accidental water seepage as natural materials would be.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

Yes, construction materials like tile, lumber, drywall, and hardware can be disposed of in a dumpster, just not in your regular garbage. As you’re planning your project, just make sure to rent the correct size of dumpster based on the scope of your needs and be aware of weight limits. Tile weighs a lot (along with other construction materials), and your costs could increase if you exceed the weight limit in your contract with the dumpster provider. 

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

Whether you want to match your tile trim with grout comes down to your personal preferences. If you match the two, it can help your tiles to stand out while providing a clean, cohesive look. On the other hand, you might opt to match your tile trim with your tiles. The best option will depend largely on your tile design, as well as how it fits overall with the rest of your room.

The Le Mars, IA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.