Top-rated subcontractors.

Get matched with top subcontractors in Alma, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Alma, GA?

Select your specific project to find the pro for you.

TRUSTED BY ALMA, GA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon19
    Verified subcontracting services reviews

Find Subcontractors in Alma

Avatar for Guaranteed Services
Guaranteed Services
4.3(
377
)

Serving Alma, GA and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"This was alright. The carpet was pretty bad so he couldn’t guarantee it could be cleaned by doing a normal cleaning so he had to get the brush out and do a scrub on it. The steam cleaner wouldn’t have cleaned it properly. He did a fine job on it and it the carpet cleaning. I wouldn’t use him again because he is far out of town."
Truckmount unit
Scrubber
Equipment
Bathroom Tile
Tile

+11

Recommended by80%of homeowners
Avatar for Luke's Painting Company
Luke's Painting Company
4.4(
40
)

Serving Alma, GA and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"Getting our new house painted was the first step into making it our home. Luke was very quick to respond when we reached out. We had a couple delays on our end and he was very accommodating. He got the work done in a timely manner. He takes directions very well, he’s professional, clean and on time. He made sure we were satisfied with everything throughout the process. I couldn’t be happier with the work that was done!"
After.. what an amazing difference!
After picture of the beautiful entryway
after picture of the fence
after.. beautiful color!
Exterior Painting in Sellers, SC

+76

Recommended by93%of homeowners
Avatar for Backyard Custom Construction LLC
Backyard Custom Construction LLC
4.4(
15
)

Serving Alma, GA and surrounding areas

In business since 2007

Emergency services offered

Credit card accepted

"This was our second project built by Backyard Construction. We had been so pleased with a 10x12' garden shed they built for us in 2012 that we had them build our art studio as well.  Once again, they did an outstanding job. We could not be more pleased with both buildings. Their part of the studio project involved constructing the shell of the structure; my husband and I, our electrician and our painter then finished the interior
We've used Backyard Construction because the quality of their buildings is excellent. After looking at dozens of other companies' offerings it was easy to see that Backyard used better materials and offered a higher level of workmanship yet was still very competitive pricewise. The studio is now one year old and the garden shed is two years old, and neither building has presented any problems whatsoever.
Construction began on time and was completed right on schedule. Their crew was courteous and extremely efficient. Dustin was a pleasure to work with. He was very responsive to our ideas and did an excellent job following up to make sure we were happy with everything. Working with Backyard Construction was a very positive experience for us each time, and we're more than happy to recommend them to others.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by80%of homeowners
Showing 1-10 of 38
Subcontractors questions, answered by experts

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

Ensures adherence to local building codes and customized designs to fit personal needs.

The Alma, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.