Top-rated subcontractors.

Get matched with top subcontractors in Broxton, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Broxton, GA?

Select your specific project to find the pro for you.

TRUSTED BY BROXTON, GA HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon46
    Verified subcontracting services reviews

Find Subcontractors in Broxton

Avatar for Guaranteed Services
Guaranteed Services
4.3(
377
)
Major Home Repairs (General Contractor)

Serving Broxton, GA and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"This was alright. The carpet was pretty bad so he couldn’t guarantee it could be cleaned by doing a normal cleaning so he had to get the brush out and do a scrub on it. The steam cleaner wouldn’t have cleaned it properly. He did a fine job on it and it the carpet cleaning. I wouldn’t use him again because he is far out of town."
Truckmount unit
Scrubber
Equipment
Bathroom Tile
Tile

+11

Recommended by80%of homeowners
Avatar for Luke's Painting Company
Luke's Painting Company
4.4(
40
)
Major Home Repairs (General Contractor)

Serving Broxton, GA and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"Getting our new house painted was the first step into making it our home. Luke was very quick to respond when we reached out. We had a couple delays on our end and he was very accommodating. He got the work done in a timely manner. He takes directions very well, he’s professional, clean and on time. He made sure we were satisfied with everything throughout the process. I couldn’t be happier with the work that was done!"
After.. what an amazing difference!
After picture of the beautiful entryway
after picture of the fence
after.. beautiful color!
Exterior Painting in Sellers, SC

+76

Recommended by93%of homeowners
Avatar for Backyard Custom Construction LLC
Backyard Custom Construction LLC
4.4(
15
)
Major Home Repairs (General Contractor)

Serving Broxton, GA and surrounding areas

In business since 2007

Emergency services offered

Credit card accepted

"This was our second project built by Backyard Construction. We had been so pleased with a 10x12' garden shed they built for us in 2012 that we had them build our art studio as well.  Once again, they did an outstanding job. We could not be more pleased with both buildings. Their part of the studio project involved constructing the shell of the structure; my husband and I, our electrician and our painter then finished the interior
We've used Backyard Construction because the quality of their buildings is excellent. After looking at dozens of other companies' offerings it was easy to see that Backyard used better materials and offered a higher level of workmanship yet was still very competitive pricewise. The studio is now one year old and the garden shed is two years old, and neither building has presented any problems whatsoever.
Construction began on time and was completed right on schedule. Their crew was courteous and extremely efficient. Dustin was a pleasure to work with. He was very responsive to our ideas and did an excellent job following up to make sure we were happy with everything. Working with Backyard Construction was a very positive experience for us each time, and we're more than happy to recommend them to others.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by80%of homeowners
Showing 1-10 of 38
Subcontractors questions, answered by experts

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Yes, custom designs match existing structural and aesthetic themes.

The Broxton, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.