Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Tallevast, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Tallevast, FL?

Select your specific project to find the pro for you.

TRUSTED BY TALLEVAST, FL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon400
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Tallevast

Avatar for EcoWater Systems
EcoWater Systems
5.0(
112
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Tallevast, FL and surrounding areas

In business since 1925

Free estimates

Emergency services offered

"Removed old nonworking water filter system from another company and nstalled a reverse osmosis water system. It works great and the installer was very prompt and professional. Work was neatly done and all questions answered. Very satisfied with the company, the system and their workers. The water tastes great."
office
3500ro
kenkena
Recommended by97%of homeowners
Avatar for Pure Pools of Southwest Florida, Inc.
Pure Pools of Southwest Florida, Inc.
4.6(
28
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Tallevast, FL and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"The pool was drained for resurface but the original material was not suitable and James, the owner of Pure Pools, refused the material. However, the pool was drained and prepped. I paid for that portion and the pool remained empty for 1 week while new material was obtained. Originally I had been told that once the pool was completed, three (3) days, and filled we could swim in it but there is a "cure" period that takes a week, FYI. I asked Pure Pools for pictures of the pool and was told that they would be sent to me but it has been more than a week and I have not received them. More important, we were supposed to receive a letter to defray costs of filling the pool to give to the water department that should have been given when we paid the final check. We have been unable to get that letter to date. The delivery of the letter to defray Water Department cost was refused until final payment. The final payment has been paid, we really need the letter and are requesting that they deliver it ASAP. Update 5/26/15: James promised a more polished pool surface, as we requested. However the surface is still very rough and bumpy. The letter for the Water department has been provided. All said, the project was completed well and during their busy time."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by91%of homeowners
Avatar for 3D Solar
3D Solar
4.6(
76
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Tallevast, FL and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"I highly recommend this company and Christopher Lawless as your sales rep. I have 3 different companies come out and give me quotes, tell me how long it would take and the quality/warranty of their equipment. 3D solar was best in every way. Chris gave me the cost and power producing expectations. I wasn't given a pushy sales talk but a realistic one. I even asked about upgrading to more panels and instead of jumping on it, earning more money, he told me I didn't need and he didn't recommend it. I went with his recommendations and have been more than pleased! Installation was extremely quick and the workers were extremely polite. They kept me up to date on their status and cleaned up afterwards. Chris even stopped by to see how it was coming and let me know he was a partner in this purchase. He let me know that the panels were actually higher level from what I believed I was going to be getting. They were able to find the perfect placement of all the equipment. They worked perfectly within code and inspection passed quickly. Even today, Chris still keeps contact with me to verify that everything is working perfectly for me. I love my online details of the power my panels are producing. 3D solar is also monitoring the system and would know if something isn't performing correctly, which I have no needed at all. I haven't had a full winter yet of collecting power to cover summer charges, but I am already saving money! My house is 2000 sq ft with a pool. Normal summer charges were between $300-359 a month. I enjoyed my $75 bill during the summer. Next summer they should be even less. My May bill was only $9!!! I highly recommend going solar! 3D solar is one of the best companies around and they are LOCAL to Tampa! Your sales people live here. The workers live here. They are neighbors who want to do great work, save you money and save the environment. Please give them a call and ask for Chris Lawless! You will NOT be disappointed!"
Solar Hot Water and Photovoltaic
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by95%of homeowners
Avatar for Kraken Pool Service, Inc.
Kraken Pool Service, Inc.
4.3(
69
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Tallevast, FL and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"I had stains and algae in the bottom of my pool from using another pool service with low quality care. I called and asked if they could reverse all of that and they sure did. My pool sparkles, looks and feels fantastic! Best pool company we have ever hired."
After resurface, tile work and pavers
After resurface, tile work and pavers
Before
Before !
Green to Clear project

+17

Response time6 hrs
Recommended by91%of homeowners
Showing 1-10 of 50
Install Above Ground Pools questions, answered by experts

A few factors influence the time it takes for a pool to heat up, including the size of your pool, the temperature outside, and how much direct sunlight is hitting the water in the pool. With these factors in mind, it takes 12 to 72 hours to raise the temperature in a pool by 20 degrees Fahrenheit.

While you can run a pool heater all day, it is advised only to run it during the day, as it is more energy efficient. At night, it is better to purchase a solar pool cover to retain the heat within the pool.

Infinity pools do require slightly more maintenance than other pools because you’ll need to constantly monitor the water level. If the water level is out of whack, it won’t correctly flow over the edge, which gives the pool its infinity look. 

That said, the rest of the maintenance is largely dependent on the type of material you choose. Concrete needs a little extra care to prevent algae growth, and you will eventually need to resurface it. Fiberglass and vinyl liners are algae-resistant but they’re not as durable.

Shock can clear a cloudy pool if the problem is insufficient free chlorine or an accumulation of chloramines from “spent” chlorine. However, it can make the issue worse if a high level of chlorine or a pH imbalance is the root cause of the problem. Test your pool water before treating the cloudiness to ensure you’re making the right call.

Sometimes, homeowners choose to install their pool on concrete, foam tiles, or patio pavers. Leveled dirt is also fine, as long as it’s not sod or grass. Regardless, you’ll need to install sand as a buffer to prevent your liner from tearing. Some pool installers also use a protective foam pool pad.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Tallevast, FL homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.