Top-rated basement remodelers.

Get matched with top basement remodelers in Oxford, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Oxford, FL?

Select your specific project to find the pro for you.

TRUSTED BY OXFORD, FL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon12
    Verified basement remodels reviews

Find Basement remodelers in Oxford

Avatar for Witty Innova Solutions
Witty Innova Solutions
4.8(
30
)
Basement - Remodel

Serving Oxford, FL and surrounding areas

In business since 2017

Emergency services offered

Credit card accepted

"Great experience with this company with the remodeling at my property, totally recommended, there were responsible, professional and diligent on timely manner, nothing bad to say, everything was as expected."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+352

Recommended by64%of homeowners
Avatar for Florida Lifetime Impact Window & Door Inc
Florida Lifetime Impact Window & Door Inc
4.1(
20
)
Basement - Remodel

Serving Oxford, FL and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"The quality of the installation wasn't very good; I had to have them come back several times. They ended up having to install a new door. However, the main principle of the company did come out afterwards to make some minor adjustments and to make sure we were satisfied."
Sliding Galss Door
Wall of windows
Additional Photos
Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Oxford, FL and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for JAS Construction & Renovations
JAS Construction & Renovations
3.0(
8
)
Basement - Remodel

Serving Oxford, FL and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"It turned out fabulous. They were on time, and punctual. They respected me and didn't take advantage of me price wise. They are reasonably priced. I have recommended them to many of my friends in the area."
Recommended by100%of homeowners
Showing 1-10 of 33
Basement Remodel questions, answered by experts

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

The Oxford, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.