Top-rated basement remodelers.

Get matched with top basement remodelers in Inverness, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Inverness, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Inverness

Avatar for Mike Harper's AC and A Picture Perfect Kitchen and Bath
Mike Harper's AC and A Picture Perfect Kitchen and Bath
4.9(
29
)
Basement - Remodel

Serving Inverness, FL and surrounding areas

In business since 2019

Credit card accepted

"Mike gave us options and worked with us to find the best option that fit our budget and get our AC running. He was very professional, explained everything and showed us exactly what the issue was and what needed to be done. Thank you so much Mike for your great services!! We would rate you higher if we could :)"
Plumbing Project
Plumbing Project
Plumbing Project
Recommended by96%of homeowners
Avatar for BGS RENOVATIONS LLC
BGS RENOVATIONS LLC
4.4(
7
)
Basement - Remodel

Serving Inverness, FL and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"We worked together on the overall plan -- layout and sequencing of all work. We ordered custom racking and they did it all. These guys are excellent to work with and everything from just the right stain shade to tile design was expertly managed."
A home we painted
wood ceiling
more ceiling work
Recommended by85%of homeowners
Shillem Specialties Inc
4.7(
13
)
Basement - Remodel

Serving Inverness, FL and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"Tim was very responsive from day one.  The job was on a cabin about 3 hours from where I live and he updated me regularly on the progress of the work. With the rain we have had this summer, the job turned into much more than he had bargained for (or quoted for)...but he stuck with it until the job was completed.  The work he did for me turned out great and I would highly recommend him to anybody looking for a hard working and honest contractor who does excellent work.
"
Side View
Front View
Entry Door
Aluminum Roof System
Before

+15

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Inverness, FL and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 28
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

It is generally more affordable to finish a basement than an attic, though it ultimately depends on how you plan to use the space. The average cost to finish a basement ranges from $7 to $23 per square foot, while attic renovation costs $30 to $60 per square foot. However, a simple attic conversion to a storage space will cost significantly less.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The difficulty of adding a basement to an existing house can vary depending on the house’s location, the size of the basement, and the type and condition of the existing foundation. Adding a basement is a job best handled by the pros, so you’ll need to enlist professional help for this project.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

The Inverness, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.