Top-rated generator install pros.

Best generator install pros near North Miami, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in North Miami, FL?

Select your specific project to find the pro for you.

Top-Rated Generator install pros in North Miami - Updated Nov 2026

Avatar for LDD Electrical Services
LDD Electrical Services
5.0(
34
)
Portable Generator - RepairGenerator - Repair - For Business

Serving North Miami, FL and surrounding areas

Approved

In business since 2022

Free estimates

Offers commercial services

"⭐⭐⭐⭐⭐ David did an amazing job repairing my generator! He showed up, quickly diagnosed the problem, got right to work, and had everything taken care of. He gave me a great price, was professional, and made the whole process easy. I’m very happy to have my generator working again. I definitely recommend David to anyone looking for reliable and honest service!"
Installing set of lights,
Installing set of lights,
Installing set of lights,
Installing set of lights,
Installing electrical pan

+49

16 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for Piper Construction
Piper Construction
4.1(
33
)
Portable Generator - RepairGenerator - Repair - For Business

Serving North Miami, FL and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"Raymond was awesome. Professional, courteous and prompt. He was able to pinpoint the problem with my generator. He wasn't able to fix it on the spot because it was an electrical issue. I decided it wasn't worth the money since the generator was a few years old and decided to buy a tri fuel new one. Definately recommend Piper. Their customer service was great too!"
Response time1 day
Response rate85%
6 neighbors recently requested a quote
Avatar for Powerup Electric Pros LLC
Powerup Electric Pros LLC
5.0(
5
)
Portable Generator - RepairGenerator - Repair - For BusinessPortable Generator - Install

Serving North Miami, FL and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

We provide dependable electric and handyman services for homeowners who need quality work completed efficiently and professionally. From small repairs and installations to home improvement projects, we take pride in clean workmanship, attention to detail, and treating every home with respect.

Chandelier mount
Panel upgrade
Panel upgrade
Panel upgrade
Panel upgrade

+7

62 neighbors recently requested a quote
...
Showing 1-10 of 275
Generator Install FAQs, answered by experts

A 10,000-watt generator can run a small to mid-sized central AC unit (typically up to 3 tons or 36,000 BTU) along with a few other appliances. However, larger AC units or additional loads will require a bigger generator. Consult a local generator installer to ensure you add the correct size generator to your home.

Portable generators provide backup power for essential appliances during outages and are easy to relocate.

With proper maintenance, a whole-house generator can last between 20 and 40 years. The specific lifespan depends on how often and for how long the generator is used, and some models may have their life expectancy rated in hours of operation. To maximize its lifespan, expect to spend around $150 to $300 per year for annual maintenance checks from a qualified technician. During these checks, a technician will inspect the engine filter, starting mechanism, fuel, lubrication, and coolant levels. Consulting your installer and choosing a low-impact fuel like natural gas or diesel can also help ensure your generator lasts as long as possible.

A 1,500 square foot home will likely need a 15kW to 20kW generator. When deciding on whole-house generator size, add up the total wattage of the devices that you’d like to continue running during a power outage. That way, you can ensure you purchase a generator that can power your necessary appliances or medical equipment during an electrical emergency.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The North Miami, FL homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.