Top-rated carpenters.

Get matched with top carpenters in Mcdavid, FL

Enter your zip and get matched with up to 5 pros

TRUSTED BY MCDAVID, FL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon10
    Verified carpentry services reviews

Find Carpenters in Mcdavid

Avatar for McDonald Construction
McDonald Construction
4.3(
22
)
Wood Stairs and Railings - Repair

Serving Mcdavid, FL and surrounding areas

Approved

Super Service Award Winner

Free estimates

Credit card accepted

Customers say: True professional

"I needed sod to be laid on my property. Kasey and Ryan made sure that it was not only done swiftly but was also quality. I’ve never seen sod laid where there weren’t any creases or lines throughout it. I highly recommend these guys. Quality work and an affordable price you simply can’t beat that."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+27

Response time10 hrs
Response rate100%
3 neighbors recently requested a quote
McDonald's Quality Home Repair, LLC
4.3(
38
)
Interior Trim and Decorative Moldings - Repair

Serving Mcdavid, FL and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Very knowledgeable and explained everything step by step and went above and beyond what I hired Ron to do. He found problems that neither the builder or inspector noted. I fully recommend and would definitely hire again. Ten stars for Ron!"
Response time3 days
11 neighbors recently requested a quote
Recommended by89%of homeowners
Hammerhead Renovation
4.3(
6
)
Interior Trim and Decorative Moldings - InstallInterior Trim and Decorative Moldings - RepairWindow Frame - Repair+1 more

Serving Mcdavid, FL and surrounding areas

Approved

In business since 2014

Free estimates

Customers say: True professional

"This remodeling took 3 months and was very extensive due to the kitchen and master bathroom were leveled down to the foundation slab. Everything was replaced in kitchen; lights, electrical sockets removed or changed, flooring, cabinets, all appliances, added trash compactors, painting, replacing baseboards, backsplash tile and mural. Master bathroom included moving a couple walls, lights, electrical sockets removed or changed, flooring, replacing baseboards and adding quarter-round, changing ceiling texture, and painting. I mention this list (which isn't comprehensive) to give you an idea of the extensive amount of work. This is important because I have a very keen eye for the quality of a contractor's work, due to my skills, and I used to be in the contracting business for a short time many years ago. My observations are to make sure all work agreed on and changes are in writing, because it will help everyone involved agree to the work required. We disagreed on a few changes, but Jimmie was professional and we came to an understanding that worked for us both. If your work is a major project like mine was then expect delays like I did. He expected 6-8 weeks and it took 11 weeks. That's not bad. We had to find another tile crew which is what delayed the project. That's not Jimmie's fault, but every contractor needs to have other people to call to pick up the slack. The quality of the work IS top quality, He is respectful and do clean up there daily trash. The painting is great if Brian does that work. Lastly, they DO show up to do repairs after the work is done, but it may take a couple requests to pin down a time. That's really good when they're backed up several months like everyone."
1 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 245
Carpentry questions, answered by experts

Your local building code will list all the framing requirements for whatever type of structure you're building. Most exterior walls require spacing of 16 inches on-center, while many non-load-bearing interior walls only require 24 inches of spacing. However, there are also varying requirements depending on your construction material, so checking your municipality's rules is essential.

Yes, walls on the top floor can be load-bearing if stacked on the floor’s foundation.

When deciding if you should use 2x6 or 2x8 deck joists, consider the size of the deck, joist spacing, and materials. Larger decks, larger-spaced joists, and weaker wood all require more support, meaning they need larger joists. For example, 2x8 redwood joists spaced 16 inches apart can only safely span up to 10 feet and 7 inches. On the other hand, 2x10 southern pine joists spaced 12 inches apart can be as big as 16 feet and 2 inches. If you aren’t sure what size joist is best for your project, speak with your deck builder.

Yes, using certified lumber and engineered wood products for reduced environmental impact.

No rules state how much of a load-bearing wall can be removed. Rather, you need to adequately support any area that is removed. Support should always be added to as much wall area is being removed. Failing to support the area properly will result in structural damage.

The Mcdavid, FL homeowners’ guide to carpentry services

From average costs to expert advice, get all the answers you need to get your job done.