Top-rated pool builders and installers.

Get matched with top pool builders and installers in Key Largo, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Key Largo, FL?

Select your specific project to find the pro for you.

TRUSTED BY KEY LARGO, FL HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon11
    Verified pool constructions and installations reviews

Find Pool builders and installers in Key Largo

Avatar for Amie Construction
Amie Construction
5.0(
5
)
Swimming Pool: Fiberglass - Build or InstallSwimming Pool: Concrete - Build or Install

Serving Key Largo, FL and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"We couldn’t be happier with our fiberglass pool and the entire experience! From start to finish, Andy was incredibly responsive, professional, and quick to address any questions or concerns we had. Their attention to detail really stood out as he was consistently at the job site. The process was smooth, efficient, and exceeded our expectations. We absolutely love our pool and would highly recommend this builder to anyone looking for a quality pool and a team you can trust. Five stars all around!"
Marathon
Marathon
Marathon
Marathon
Marathon

+7

5 neighbors recently requested a quote
Avatar for Topline Building & Remodeling, Inc.
Topline Building & Remodeling, Inc.
5.0(
79
)
Swimming Pool -Remodel

Serving Key Largo, FL and surrounding areas

Approved

In business since 2006

Free estimates

Small jobs welcome

"Jefferson & his crew where very prompt, professional, & hard working. They showed up on time & did a beautiful job replacing the tile/gravel front walkway that was replaced with bricks. They widened the path & did a beautiful job. We are very pleased with the result and highly recommend them. They cleaned up at the end & even put some sand under some of our pool deck pavers that were loose & uneven. Highly recommend this company. A very high quality job at a very fair price."
Pool Deck Paver Repair
Roof Pressure Cleaning
Pressure Cleaning S. Florida
Brick Pavers Repair on Pool Deck
Roof Pressure Cleaning

+1

Response time2 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for O.P. Pool Leak Detections llc
O.P. Pool Leak Detections llc
4.7(
15
)
Above Ground Swimming Pool or Accessories - Repair or ServiceIn Ground Swimming Pool or Accessories - Repair or ServiceReplace Vinyl Liner for Swimming Pool+6 more

Serving Key Largo, FL and surrounding areas

Free estimates

Emergency services offered

Warranties offered

"OP Pool is an amazing company and I would highly recommend for everyone with a pool that needs services for repairs. He is very knowledgeable, informative, patient and cost efficient. Thank you so much Onarbin! Will be my maintenance pool guy moving forward."
Pool & Spa Service and Repair Project
Pool & Spa Service and Repair Project
Pool & Spa Service and Repair Project
Pool & Spa Service and Repair Project
Pool & Spa Service and Repair Project

+33

Response time10 hrs
Response rate95%
Recommended by86%of homeowners
...
Showing 1-10 of 55
Pool Construction and Installation questions, answered by experts

Land surveying can help give clear guidance on your property boundaries for numerous situations. And in some cases, having your land surveyed is a requirement. Some common reasons to have your land surveyed include:

  • Planning for construction projects, like building a fence

  • Locating utilities, such as plumbing fixtures

  • Settling property line disputes 

  • Creating subdivisions 

  • Meeting mortgage requirements

  • Selling your property

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

Construction typically takes 3-6 months, including site preparation and assembly.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The small lines on the tape measure either indicate inches, fractions of an inch, or centimeters and millimeters. On the imperial unit side (aka the inches side), the longest lines indicate inches, followed by the next shortest lines that indicate a half-inch, and then the quarter, eighth, and sixteenth-inch. On the metric side, the lines break down meters, centimeters, and millimeters.

The Key Largo, FL homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.