Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Union, CT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Union, CT?

Select your specific project to find the pro for you.

TRUSTED BY UNION, CT HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon10
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Union

Pool-Pros
4.9(
8
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Union, CT and surrounding areas

Approved

In business since 2023

Free estimates

Customers say: Quick response

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer’s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

18x33 oval for ken
24 ft round replacement
30 ft liner change
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for NORTH STAR CONSTRUCTION,DEMOLITION,EXCAVATION
NORTH STAR CONSTRUCTION,DEMOLITION,EXCAVATION
4.6(
9
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Union, CT and surrounding areas

Specializing in hauling! We always guarantee your satisfaction and won’t leave until the job is done right. We take pride in ourselves and on the quality work we provide, while always delivering great customer service! Check out our services offered, then call --or-- click to schedule a free estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Recommended by87%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Union, CT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

It’s best to avoid having wrinkles in a new pool liner. Since pool liners are very thin, it’s easy to have slight wrinkles in the liner upon initial installation. This might negatively affect your pool’s visual appearance and lead to tearing and holes in some cases. You’ll want to ensure proper measurements and accurate alignment during the installation process to prevent unsightly wrinkles from appearing.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, you can use chlorine tablets in a salt water pool. It is not the standard recommended practice, but if your pool needs more chlorine, adding tablets can help temporarily fix the problem. Only add as many tablets as needed to keep your chlorine level around three parts per million. After adding the tablets, test your water to determine the chlorine content.

Yes, you will need to shock your pool with high levels of chlorine or bromine when you first fill it to kill off bacteria and pathogens. You’ll need to wait for the chlorine concentration to come back down to a safe level before swimming. After that, you can test and maintain the chlorine and other levels as normal. The only exception to this is if you get pool water delivered by a professional. In that case, the water might come pretreated, so you might not need to shock it.

A black tarp will indeed heat your pool. Black absorbs more heat than other colors. This heat will transfer down to the water in your pool and help increase the temperature. It will not be extremely effective at raising the overall temperature, but it can help maintain the current temperature.

The Union, CT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.