Top-rated excavation pros.

Best excavation pros near Hartsel, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Hartsel, CO?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Hartsel - Updated Nov 2026

FC&T's, LLC
2.8(
25
)
Landscape - Minor Grading or Resloping

Serving Hartsel, CO and surrounding areas

Approved

In business since 1980

Free estimates

Small jobs welcome

"We hired FC&T to replace the deck planking and railings as well as staining the front of our cabin as well as the deck planking and railings. They showed up when they said they would and completed the work in a timely manner. I am very happy with the work they did and would not hesitate to recommend them to anyone. We had a short time frame to get this completed and they finished on time. They were very conscientious in their work to ensure that everything was moved and/or covered while spraying the staining and ensuring that everything was dry before moving anything back."
Response time3 days
14 neighbors recently requested a quote
Recommended by87%of homeowners
Showing 1-10 of 38
Excavating FAQs, answered by experts

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

Because decomposed granite is a durable material, a crushed rock or gravel base is optional as long as the DG is properly installed and compacted. However, installing a base is a good idea because it will ensure proper drainage and stability and act as a weed suppressant (although you may still occasionally have to pull weeds). Installing an adequate base can also increase the durability of driveways and walkways. If you forego the paver base or gravel underneath, line the area with landscaping fabric to avoid weeds.

There is no standard depth for burying a septic tank; they are typically buried anywhere from 4 inches to 4 feet underground. The final depth depends on several factors, including the depth of your main sewer line, the height of the bedrock, soil type, local regulations, and the property's landscape. If you plan to grow grass or plants over the tank, a depth of at least 4 to 6 inches is recommended. Deeper tanks can be more difficult to locate, but a septic professional can help find it for you.

A crawl space can be as little as 42 inches below the grade of your house, but this is not always recommended in flood-prone areas. At a minimum, there must be at least 16 inches of clearance between the ground and the floor joists to access the space in an emergency.

Maintain open communication and address issues as they arise, ensuring contract terms cover potential delays.

The Hartsel, CO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.