Top-rated excavation pros.

Best excavation pros near Crested Butte, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Crested Butte, CO?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Crested Butte - Updated Nov 2026

Avatar for Drake Austin Contractor
Drake Austin Contractor
4.9(
8
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving Crested Butte, CO and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"Drake was extremely responsive and professional throughout the project, and followed through to complete the job with excellent quality on a timely basis. I would definitely hire Drake again, and most likely will."
Deck Extension
hot tub pad before deck install
Before replacement
New install
Hose Bib Cover

+10

Response time2 days
7 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Rocking K Rolloffs LLC
Rocking K Rolloffs LLC
5.0(
5
)
Building Site - Preparation and Clearing - For Business

Serving Crested Butte, CO and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

is committed to excellence \nin every aspect of our business. We uphold a standard of integrity bound by \nfairness, honesty, and personal responsibility. Our distinction is the quality \nof service we bring to our customers. Accurate knowledge of our trade combined \nwith ability is what makes us true professionals. Above all, we are watchful of \nour customers' interests, and make their concerns the basis of our business.

2 neighbors recently requested a quote
Showing 1-10 of 41
Excavating FAQs, answered by experts

You can bury underground electrical wire six inches deep—but only if you use a rigid metal electrical conduit. For rigid, non-metallic conduits, bury the wire at least 12 inches deep. If using an underground feeder cable rated for direct burial, you'll need to place it at least 18 inches deep, as it has no conduit for extra protection.

Consultation with the local government helps identify necessary permits, avoid project delays or legal issues, and protect project integrity.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

The Crested Butte, CO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.