Top-rated bathtub replacement pros.

Get matched with top bathtub replacement pros in Brisbane, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your bathtub replacement project in Brisbane, CA?

Select your specific project to find the pro for you.

TRUSTED BY BRISBANE, CA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon925
    Verified bathtub replacements reviews

Find Bathtub replacement pros in Brisbane

Avatar for Jacuzzi Bath Remodel of California
Jacuzzi Bath Remodel of California
4.7(
229
)

Serving Brisbane, CA and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

"Nate- Atl & Hubter- Atl. were very professional and efficient with the tear out and installation of our new bathtub. They communicated each of the steps with us and a full explanation before leaving. They arrived on time and finished earlier than I was expecting. Great job guys!"
138 neighbors recently requested a quote
Recommended by92%of homeowners
Avatar for My Remodeling Group
My Remodeling Group
5.0(
36
)

Serving Brisbane, CA and surrounding areas

Approved

In business since 2023

Credit card accepted

"My Remodeling Group did an excellent job remodeling my bathroom. Their team was professional, organized, and very detail-oriented throughout the project. They helped me select quality materials, explained each step clearly, and kept the work area clean. The final result looks modern, functional, and beautifully finished. The project was completed on time, and the workmanship exceeded my expectations. I?m extremely happy with the outcome and would gladly recommend My Remodeling Group."
Kitchen remodeling
Kitchen remodeling
Kitchen remodeling
Kitchen remodeling
Bathroom remodeling

+30

Response time2 days
Response rate100%
Avatar for Plumbing 1 Builder's Inc
Plumbing 1 Builder's Inc
5.0(
16
)

Serving Brisbane, CA and surrounding areas

Approved

Super Service Award Winner

In business since 2011

Free estimates

Warranties offered

"Leo Tony and his crew were very responsive and replaced an old galvanized waterline with copper quickly and efficiently . Very knowledgeable about new insurance regs and installed new leak detector valve also. Also installed efficient garden sprinkler Definitely recommend"
Response time3 hrs
59 neighbors recently requested a quote
Avatar for S&L REMODELING AND DESIGN INC
S&L REMODELING AND DESIGN INC
4.9(
47
)

Serving Brisbane, CA and surrounding areas

Approved

In business since 2013

Free estimates

Warranties offered

"I don't usually post, particularly pics of my home. But... We are so happy, I had to share so that others could benefit from our experience. 13 working days to completely remove/replace kitchen (never been remodeled since 1979!), install recessed lighting in raised ceiling, and repaint ceiling & walls of the formal living room!!! An impossible timeline that they were more than willing to accommodate at the lowest bid price. Couple of times, working 12hour days. Believe me, we never expected them to labor so hard and we were skeptical dealing with other contractors that always go double the promised timelines. They helped patch walls for free where we had plumbing work done by our plumber. Not only are these guys professional, but they are neat, organized, and always clean up after themselves. They walked us through tile/material selections in the beginning. And they even moved our furniture for us during the process. Coming up with solutions to questions before you think to ask them. Can't say enough."
Bathroom Remodel-Moraga,CA
Kitchen Remodel - San Ramon, CA
Bathroom Remodel Danville, CA
Bathroom Remodel Concord, CA
Kitchen Remodel Walnut Creek, CA

+43

Response time2 days
Response rate90%
7 neighbors recently requested a quote
Avatar for In & Out Plumbing & Construction Inc
In & Out Plumbing & Construction Inc
4.2(
78
)

Serving Brisbane, CA and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"In and out plumbing is great!  Easy to make an appointment... called at 9pm and scheduled service for the following day.  Plumber Mike was on-time and polite.  After showing him our leaky shower faucet, he provided two quotes- one to replace parts, the second to upgrade the plumbing to today's standards (1955 house).  After a few minutes we opted for the former.  Unfortunately there was a bolt that seemed to be glued in and so the handle stems had to be cutt off (also explains why my husband couldn't unsrew it the evening before).  The replacement were of an old design therefore Mike warned us that it may be difficult to find at a store.  He spend 45 minutes looking for it that day and upon not finding it at open stores, returned at 9am sharp the following morning to pick up the broken part (which he had replaced the night before so that the water could be turned back on for us) and spent about 60 minutes away while at another store.  Luckily he was able to find the part and had the faucet fixed by 11am.  During the entire work Mike was kind, communicative and obviously working hard to successfully complete the job.

Additionally, another plumber, Steve from In and Out Plumbing provided service just a few days prior for another problem... a corroded pipe with a hole was leaking water from our kitchen drain.  Steve was also very polite, communicative about our options for the repair, and was able to replace 2 feet of piping in about 30 minutes. 

In and Out Plumbing has been great on two occasions!  We will definitely use them again if we have any more plumbing issues."
San Francisco Sewer Line
Floor Drain
San Francisco Sewer Line
Floor Drain
San Francisco Sewer Line

+27

Response time1 day
Response rate97%
40 neighbors recently requested a quote
Avatar for OT Bay Builders
OT Bay Builders
5.0(
109
)

Serving Brisbane, CA and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Warranties offered

"We replaced our old wood siding with vinyl, and we couldn’t be happier. The house looks brand new! The team worked quickly, left the site clean, and the quality is top-notch. Highly recommend if you're looking for a low-maintenance upgrade."
Broadway Kitchen Remodel
Broadway Full Kitchen remodel
Broadway Full Kitchen remodel
San Francisco Contemporary Kitchen Remodel
San Francisco Contemporary Kitchen Remodel

+81

Response time12 hrs
Response rate98%
1 neighbors recently requested a quote
Avatar for Ovation Restoration, LLC
Ovation Restoration, LLC
4.2(
102
)

Serving Brisbane, CA and surrounding areas

Approved

In business since 1997

Free estimates

Emergency services offered

"Ovation manages client contracts and finances while Unique Interiors (Kris Tavares) crews do the work. Overall, the construction was of average quality, and am I generally satisfied with the results. Most workers were timely, friendly, and cleaned up after themselves. However, there were a number of issues of missed timelines, demands for early payments (although the total paid was as agreed). Several of the subs or workers were problematic and callbacks from both Ovation and Unique were difficult. His work was often installed where other work was planned. As a result, his work needed redoing. Because he was rarely quickly available to fix his mistakes, these erred installations significantly increased the project duration. He rarely cleaned up after himself, leaving scraps, and construction debris left where he worked requiring other workers or the homeowner to clean-up. His worst mistake was drilling a 3 ½ in a hole in an array of standard 2X4s to accommodate a 2 in conduit to pass through. The result was that the involved wall required reconfiguring to ensure structural soundness. This event was complicated by his using brute force to remove a frozen stud in an electrical meter base, which then broke off. Instead of drilling out the broken stud, he ordered a new service, which necessitated a two-week period with no electricity to the house. Not only did this delay the project, if necessitated people living here to vacate during this time and required use of an extension cord from a neighbor to keep the refrigerator and freezer running. This alone was cause for a 3-week delay in the overall project. A number of other delays were the result of materials not ordered in a timely manner so that when workmen were assigned, instead of beginning work on the ordered materials, they had to go find what was needed at the store. In some cases, this required ordering materials that were back-ordered, adding to the delays. It must be said that this small project was originally projected to have an elapsed completion time of 1 month. In all, the project took over 4 months with many interim completion dates given and passed. These delays were complicated by two international trips the owners took, one of which I hired a person to oversee construction in my absence, the second because of problems in my first absence, I halted construction for 3.5 weeks while I was gone. The person hired to install cabinets, which were very nice quality, were hung in a very unprofessional manner with screw heads exposed inside the cabinets and many of these proud of the cabinet wall, which prevented me from using screw covers. About cabinet designs: I was presented a cabinet plan and pressured to approve it. We discussed the plan and made some agreements of the changes needed and I signed off. Unfortunately, all the changes we discussed were not followed and some original designs were ordered. This was my error for signing off to a plan without better documentation of the oral changes.Part of the plan was the installation of a shallow counter that needed custom fabrication. The finish material had to be repaired and this did not work so it was agreed to replace the counter as warranty work after the project was completed. The person who built this also undertook the redo. The final quality of the work was very poor. The counter was somewhere from ¼ to 1/8 inch away from the wall. He attempted to fill the gap with silicone and smeared it on both the wall and the counter. He left the redo in this condition without letting the owner know he was going. I reported this issue to both Ovation and Unique, without any response. I had to make the repair on the counter myself."
Breathtaking solid slab granite countertops
Walk-in shower with sliding glass door
Handicap accessible with style
New lighting
Antique white custom cabinets

+133

Response time10 hrs
Response rate93%
2 neighbors recently requested a quote
Avatar for Blues Brothers Construction, Inc.
Blues Brothers Construction, Inc.
4.8(
50
)

Serving Brisbane, CA and surrounding areas

Approved (Corporate)

In business since 1970

Free estimates

Warranties offered

"Mika Aloni and the Blues Brothers Construction team are amazing! Mika Aloni was the Project Manager for the remodel of my kitchen and bathroom and she did a great job. The rooms look brand new and I'm thrilled with the work. I highly recommend Mika Aloni and Blues Brothers Construction for your remodel projects."
Kitchen-After
Kitchen-After
Bathroom-After
Kitchen-After
AFTER

+443

Response time9 hrs
Response rate98%
15 neighbors recently requested a quote
...
Showing 1-10 of 496
Bathtub Replacement questions, answered by experts

Whether replacing a bathtub with a shower affects your home's value depends on several factors, with the most significant being whether it's the only tub in the house. Removing the sole bathtub can lower a home's value because many prospective buyers, particularly families with young children or pets, require at least one.

However, a tub-to-shower conversion can also increase home value. A modern walk-in shower is often seen as an upgrade in a secondary bathroom and can be a desirable feature for its accessibility and style, appealing to older homebuyers or those without children. The overall impact is also influenced by your local real estate market and its typical buyer demographic.

If your bathroom layout allows, installing both a freestanding bathtub and a separate shower can be an ideal solution that appeals to the widest range of potential buyers.

The overflow drain and wastewater drain connect to the same main pipe to take water away from your bathtub. Your overflow drain is meant to prevent damage to your bathroom—especially the floor around your bathtub, where excess water can quickly create a mold or mildew problem.

Fiberglass tubs last between 10 and 15 years or more if they’re well-maintained. Proper care will help them last as long as possible. However, fiberglass bathtubs are prone to cracking, fading, and scratches over time. Bathtub installation by a plumber is one of the best ways to ensure your tub has the right support to last its full lifespan.

While tubs are fairly sturdy, you may notice cracks or holes. This kind of damage can happen from someone accidentally dropping something heavy into the tub. You might also see damage if you drop something heavy into the tub over and over again (like your extra large bottle of body wash). While you might only notice a small dent at first, this can later turn into a crack or a hole.

Also, certain cleaners that are harmful to your tub can cause damage. And if you have a fiberglass tub, you might see cracks if it was not installed properly with the right support.

A professional bathtub installation or replacement typically takes one to three days, depending on the project's complexity and any necessary alterations. If you hire a professional, most replacements can be completed in one to three days. However, if you choose the DIY route, the process could take up to a month, as it involves removing the old tub and drywall, installing the new tub, repairing the drywall, and installing new tiling.

The Brisbane, CA homeowners’ guide to bathtub replacements

From average costs to expert advice, get all the answers you need to get your job done.