Top-rated cabinet contractors.

Get matched with top cabinet contractors in Scott, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Scott, AR?

Select your specific project to find the pro for you.

Find Cabinet contractors in Scott

Avatar for Freewalt Builders Inc
Freewalt Builders Inc
4.6(
61
)
Cabinets - RefaceCabinets - Refinish

Serving Scott, AR and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"The work really took a long time, they have to take all the cabinets down and bring them to their shop, I originally wanted it done before Christmas but they weren't able to finish and got the cabinets after the holidays had gone. But the laying of the tile for the bathroom was very well done and they did a very good on the tile work. I give an "A" Rating for the tile floor installation."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by92%of homeowners
Avatar for THE O'KIRBYS L.L.C.
THE O'KIRBYS L.L.C.
5.0(
11
)
Cabinets - Repair

Serving Scott, AR and surrounding areas

In business since 2024

Free estimates

Warranties offered

"The Oâ Kirbys installed holiday lights for me and not only did they do good work, but when they ran into various obstacles with the design of my house, they went above and beyond to find a solution."
Response time1 day
Recommended by72%of homeowners
Avatar for Arkansas Wood Doors
Arkansas Wood Doors
5.0(
8
)
Cabinets - InstallCabinets - RefaceCabinets - Refinish+3 more

Serving Scott, AR and surrounding areas

In business since 1977

Free estimates

Credit card accepted

"Excellent work. We purchased natural cherry cabinets in shaker style, with the panels made of solid wood rather than veneer. That is more difficult work, as each panel has to be constructed from several planks. Moreover, the clear finish would leave any flaws more visible. Simply put, the doors are beautiful--flawless in both construction and finish. They are similar in quality to custom cherry furniture we own."
Additional Photos
Additional Photos
.
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
...
Showing 1-10 of 85
Cabinet Contractors questions, answered by experts

In a kitchen installation, starting with the foundation and structural elements before moving on to the finishing touches is essential. Framing, plumbing, and utilities should go first, followed by cabinetry and countertops, then plumbing fixtures and new appliances. Flooring, paint, tile backsplashes, and similar finishing touches should get installed last.

There are three primary ways to attach upper kitchen cabinets to a wall, and installers may use more than one method at a time. The most common method is to drive screws through the back of the cabinets and into studs in the wall behind. Sometimes cabinets are glued to the wall with strong adhesive. Often a combination of screws and adhesive is desirable. The last way is by hanging the cabinets on hardware brackets that attach to the wall before cabinet installation.

Late summer or early fall are two popular times to upgrade kitchen cabinets. With the holidays right around the corner, this gives you spillover time in case your renovation project takes longer than anticipated. Then you get to host and show off your new kitchen when company comes.

It depends on your ceiling height. Wall cabinets are typically mounted 54 inches from the floor. So, if you have eight-foot ceilings, you’ll need 42-inch-high wall cabinets to fill the gap. And you’ll need 54-inch cabinets if you have nine-foot ceilings. But standard-sized cabinets don’t come in 54 inches, so you'll need to stack various sizes together. And, if you have ceilings higher than nine feet, it’s a good idea to have custom stacked cabinets made to fill your space.

It depends on whether you buy pre-made stacked cabinets or construct them from scratch. If you build added cabinets from scratch, you can expect it to take several hours or days to build each one and then another two to three days for installation. Then, after painting your new cabinets, you should allow a few weeks for the paint to dry thoroughly before installing them over your existing cabinets.

The Scott, AR homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.