Top-rated excavation pros.

Get matched with top excavation pros in Jonesboro, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Jonesboro, AR?

Select your specific project to find the pro for you.

Find Excavation pros in Jonesboro

Perdew Excavating
1.8(
3
)
Excavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Jonesboro, AR and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"They are very good in working the soil above a septic field with a very good feel for what is happening to the soil, that is whether to stop or continue working. They do a good job in clearing according to what the owner wants and needs/ They are friendly and work responsiblely."
Response time4 hrs
Recommended by50%of homeowners
Showing 1-10 of 16
Excavating questions, answered by experts

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

The best method for digging a trench depends on the scope of the project. For a short, shallow trench (less than 2 feet deep) in light, soft soil, digging by hand may be sufficient. However, digging by hand is labor-intensive, so consider the effort required. A machine trencher is the better option for longer trenches (over 100 feet), deeper ones, or when dealing with difficult soil conditions, such as rocky or hard ground, or obstructions like tree roots. A machine can save significant time and energy in these situations.

Yes, chipmunk holes may have two or more entrances. Chipmunks can create an entire network of burrows. Having multiple entrances makes it easier for them when trying to escape from a predator, such as a snake, or if an entrance collapses due to flooding. Each entrance leads to the nesting chamber underground, which is where the chipmunk spends the majority of its time sleeping.

To drill a shallow well, you may be able to use a drive well point. This is a tapered point that is driven into the ground. A drill bit at the end of PVC pipe may be another option to consider. A lot of the cost depends on what tools are available near you.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.