Top-rated excavation pros.

Get matched with top excavation pros in Osceola, AR

Enter your ZIP and get matched with up to 5 pros

Need a pro for your excavation project in Osceola, AR?

Select your specific project to find the pro for you.

Find Excavation pros in Osceola


Wilson's Industrial inc.

No reviews yet

Wilson's Industrial inc.

No reviews yet

Industrial Instrumentation, spray foam insulation, erosion control, excavation, trenching,directional boring, cabling, piping, utility installation, legally licensed and bonded, over 20 years of business experience.

Industrial Instrumentation, spray foam insulation, erosion control, excavation, trenching,directional boring, cabling, piping, utility installation, legally licensed and bonded, over 20 years of business experience.


Iron Forces Land Management

No reviews yet

Iron Forces Land Management

No reviews yet
15 years of experience

We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule an estimate today!

We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule an estimate today!







All-Star Construction Service LLC

No reviews yet

All-Star Construction Service LLC

No reviews yet
11 years of experience

All-Star Construction Service LLC is a licensed, bonded, and insured contractor with the knowlage, experience, equipment needed to complete your project. Our goal is to provide quality construction services in a cost efficient and timely manner with safety and environmental well being as our top priorities.

All-Star Construction Service LLC is a licensed, bonded, and insured contractor with the knowlage, experience, equipment needed to complete your project. Our goal is to provide quality construction services in a cost efficient and timely manner with safety and environmental well being as our top priorities.


Terry Daniels Construction

5.00(
1
)

Terry Daniels Construction

5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We are a small company that believes debt is a bad thing, not only for us but also for our clients. We therefore maintain very little overhead and pass this cost reduction on to the client. We do most of the work ourselves to protect our quality standards of the finished product. Payment terms will be completely laid out in a contractual agreement ahead of time to avoid surprises. Payment is primarily determined by the length of the work. Less than 1 week - due on completion. More than 1 week - labor costs to date due each week, material costs to date due on completion or every 30 days. The company virtually makes nothing until the job is completed as agreed and final payment is received.

We are a small company that believes debt is a bad thing, not only for us but also for our clients. We therefore maintain very little overhead and pass this cost reduction on to the client. We do most of the work ourselves to protect our quality standards of the finished product. Payment terms will be completely laid out in a contractual agreement ahead of time to avoid surprises. Payment is primarily determined by the length of the work. Less than 1 week - due on completion. More than 1 week - labor costs to date due each week, material costs to date due on completion or every 30 days. The company virtually makes nothing until the job is completed as agreed and final payment is received.

Showing 1-10 of 23
Excavating questions, answered by experts

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Downspouts should be buried at least 5 to 10 feet away from your foundation. This can vary depending on your local building codes, soil type, and property slope. The main goal is to ensure water is directed away from your foundation.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

The Osceola, AR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.