Top-rated asphalt driveway pros.

Best asphalt driveway pros near Fairmont, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Fairmont, WV?

Select your specific project to find the pro for you.

TRUSTED BY FAIRMONT, WV HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon12
    Verified asphalt driveway services reviews

Top-Rated Asphalt driveway pros in Fairmont - Updated Nov 2026

Avatar for TCB Paving LLC
TCB Paving LLC
4.3(
79
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Fairmont, WV and surrounding areas

Approved

Super Service Award Winner

In business since 1989

Free estimates

Warranties offered

"TCB applied asphalt over existing driveway to level dips and irregularities. Richard was prompt in his initial reply, quoted over the phone, and started the job the next day. Crew was personable, efficient, and tidy. Driveway looks nice.."
Asphalt
Paving
Blacktop
A
B

+8

Response time2 days
Response rate87%
33 neighbors recently requested a quote
North Central Paving
New to Angi
Asphalt Paving - InstallAsphalt Sealing

Serving Fairmont, WV and surrounding areas

Approved

In business since 1980

Free estimates

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time1 day
Avatar for BushCo, LLC
BushCo, LLC
5.0(
7
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Fairmont, WV and surrounding areas

In business since 2022

Free estimates

Small jobs welcome

"All work was done in a professional manner. The project was timely commenced and completed with no delay. The trees involved were over 100 years old and very big. The crew were experienced and properly trimmed out huge limbs without damage to the trees or the area around them."
U-Shaped Driveway
Pond Completion
88 Foot Long Pond Dam
New Driveway Install
Land Clearing and Ditching

+9

Response time1 day
Recommended by100%of homeowners
...
Showing 1-10 of 54
Asphalt Driveways FAQs, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

The Fairmont, WV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.