Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Bethany, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Bethany, WV?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Bethany

Avatar for New Era
New Era
5.0(
1
)
Concrete Floor Coating-Apply - For Business

Serving Bethany, WV and surrounding areas

In business since 2015

Free estimates

Warranties offered

We are committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customer interests and make their concerns the basis of our business.

Large Shop
Office Space
Restrooms
Garage Floor
Logo

+23

Recommended by100%of homeowners
Showing 1-10 of 12
Epoxy Flooring questions, answered by experts

Mix the resurfacer into a sticky mixture. The consistency should look like mashed potatoes. Use a squeegee to push the resurfacer across the pitted area and smoothen the surface with a cement trowel flush. Make sure you protect any expansion joints with a weather strip. Alternatively, cut out any resurfacer that touched the joint once the mixture begins to harden.

Always seal concrete stain to protect against wear and preserve the color. This applies to acid- and water-based stains but not always to concrete paint. Many paints designed for outdoor use contain ingredients designed to protect and waterproof without the need for additional sealant. Fortunately, learning how to seal concrete is something most DIY-savvy homeowners can tackle.

Flooring professionals can typically apply epoxy within one or two days, depending on how much preparation or repair the old floor needs before application. However, you’ll need to wait after the application is complete to use the flooring. While you can walk on the epoxy flooring before it fully cures, it can take up to 72 hours for the epoxy floor to fully dry and be ready for full use.

The prevention steps are essentially the same, no matter the patio material. Keep the surface clean and maintained. Ensure there's no debris buildup, and cover the whole thing in a quality sealant. If it's the start of a season or it's been a while since you've cleaned the area, use a pressure washer.

The biggest downside of sealing concrete is that it needs to be resealed every few years. This routine maintenance can be laborious if you do it yourself and expensive if you hire a professional. Beyond that, sealing concrete can make the surface slippery, which can be dangerous with people with mobility issues, young children, or those with pools near their patios.

The Bethany, WV homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.