Top-rated basement remodelers.

Get matched with top basement remodelers in Genoa, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Genoa, WI?

Select your specific project to find the pro for you.

Find Basement remodelers in Genoa

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Genoa, WI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Brown & Son Construction LLC
New to Angi
Basement - Remodel

Serving Genoa, WI and surrounding areas

In business since 2018

Free estimates

Offers commercial services

\nWe are extremely passionate about the work that we do. You can depend on us to provide a high quality service at a fair and honest price. We understand that the future of our business depends upon our reputation and that is why customer service is by far our highest priority. If you are looking for a professional you can trust, please call today to schedule a no-obligation estimate!\n15 years exp

Showing 1-10 of 14
Basement Remodel questions, answered by experts

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The Genoa, WI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.