Top-rated subcontractors.

Get matched with top subcontractors in Burnett, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Burnett, WI?

Select your specific project to find the pro for you.

TRUSTED BY BURNETT, WI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon111
    Verified subcontracting services reviews

Find Subcontractors in Burnett

Avatar for GF Company
GF Company
4.6(
152
)
Major Home Repairs (General Contractor)

Serving Burnett, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"They were very helpful on advising on specifications. In general, I found roofers specifying roof replacement the cheapest way possible rather than what is most cost effective long-term. Once, I got multiple contractors matching on specs, GF was clearly cost competitive, particularly given no subcontractor usage. Actual install was smooth except for two things. It took more time than they budgeted for, but they handled that well and didn't try to ask for extra payment. Second, they discovered that the backing of the house's original aluminum siding was rotten when they were installing new flashing. Understandably, they didn't want to put it back up as is (which I can appreciate). Thankfully, they were able to provide a cost effective answer regarding new siding, as I didn't want to have to big that out with everything already torn up."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Stendahl Exteriors
Stendahl Exteriors
4.1(
252
)
Major Home Repairs (General Contractor)

Serving Burnett, WI and surrounding areas

In business since 2005

Credit card accepted

"It was great - they were quick and thorough. They even found a bit of flashing that was loose and repaired it. 
Followed up with an estimate to replace our roof. 
We would definitely use them in the future - I had my eyes out for the same deal from them this year!!
"
Before
During
Completion
Before
During

+3

Recommended by82%of homeowners
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Burnett, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 36
Subcontractors questions, answered by experts

Yes, professionals offer design services that ensure cohesive appearances.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

When planning a general remodeling project, it's important to define the scope of work, understand your goals, and set a clear, detailed budget. You should also assess the current structure and consult with professionals like architects or contractors. Create a realistic timeline for each phase, obtain any necessary permits, and build in contingency plans for potential delays or unforeseen issues. Regular communication with all involved parties is crucial to streamline the process.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Burnett, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.