Top-rated subcontractors.

Get matched with top subcontractors in Juneau, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Juneau, WI?

Select your specific project to find the pro for you.

TRUSTED BY JUNEAU, WI HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon97
    Verified subcontracting services reviews

Find Subcontractors in Juneau

Avatar for Custom Craft Environmental
Custom Craft Environmental
4.6(
117
)

Serving Juneau, WI and surrounding areas

In business since 1991

Emergency services offered

Credit card accepted

"He had a cancellation and was able to come out the day I called. He verified that we actually didn't have mold growing in the one area. Since that area was connected to an indoor hot tub room, he checked the tub room just to verify that all was ok in there. He gave me some tips on preventing mold in that tub room and informed me about some other areas to watch (as this was in the basement and we have had water get inside with heavy rain) and I asked him about some marks on my basement ceiling. He was very knowledgeable and helpful. Will definitely be calling if need for future services."
Additional Photos
Additional Photos
Additional Photos
Before
After

+1

Recommended by94%of homeowners
Avatar for GF Company
GF Company
4.6(
152
)

Serving Juneau, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"They were very helpful on advising on specifications. In general, I found roofers specifying roof replacement the cheapest way possible rather than what is most cost effective long-term. Once, I got multiple contractors matching on specs, GF was clearly cost competitive, particularly given no subcontractor usage. Actual install was smooth except for two things. It took more time than they budgeted for, but they handled that well and didn't try to ask for extra payment. Second, they discovered that the backing of the house's original aluminum siding was rotten when they were installing new flashing. Understandably, they didn't want to put it back up as is (which I can appreciate). Thankfully, they were able to provide a cost effective answer regarding new siding, as I didn't want to have to big that out with everything already torn up."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for VM Contracting LLC
VM Contracting LLC
4.6(
16
)

Serving Juneau, WI and surrounding areas

"We had VM contracting do the roof on our home a couple years ago and the work was stellar! When we needed the windows replaced we had Mr. Vinney come back for this job. 10 windows and a large bay window. The work, once again, was very well done! Very competitive pricing and on time completion. We will use them in the next year or so when we we do the siding our home! Highly recommended!"
Additional Photos
Recommended by92%of homeowners
Avatar for PK Pro Contracting
PK Pro Contracting
5.0(
7
)

Serving Juneau, WI and surrounding areas

In business since 1983

Credit card accepted

"They were great. I recently opened my new suite and needed flooring that wouldn’t ruin the base boards and the carpet. They did just that. They finished in a day and some hours. Also I needed them pretty last minute and he came asap and started working on the floors. It looks amazing. Highly recommend."
Before
After
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 43
Subcontractors questions, answered by experts

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

While you will always work with a team of professionals at some point during your home build, homeowners with experience can take on some part of the process. Manage the initial brainstorm, brief writeup, and floor layout phase with minimal assistance before contacting a general contractor. And while you can purchase stock blueprints for some home designs, it's always best to speak with professionals when choosing one ideal for your property.

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

The Juneau, WI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.