Top-rated basement remodelers.

Get matched with top basement remodelers in Tekoa, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Tekoa, WA?

Select your specific project to find the pro for you.

Find Basement remodelers in Tekoa

Avatar for Elite Construction & Remodeling
Elite Construction & Remodeling
4.7(
97
)

Serving Tekoa, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Emergency services offered

"Sergey and the team at Elite did a great job with our basement remodel, we are very happy with the results. The entire team (including subcontractors) were professional and respectful. I would use them again for any project that we have."
Beautiful Bathroom Remodel
Beautiful Bathroom Remodel
Beautiful Bathroom Remodel
Beautiful Bathroom Remodel
Beautiful Bathroom Remodel

+18

Response time1 day
20 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Hickman Home Worx LLC
Hickman Home Worx LLC
New to Angi

Serving Tekoa, WA and surrounding areas

Approved

Small jobs welcome

Offers commercial services

With over 15 years of hands-on experience in the construction industry, I bring proven\nleadership, precision, and accountability to every project. I have successfully managed and\ndelivered multimillion-dollar builds ranging from detailed remodels to full ground-up construction.\nNo matter the size or scope, my focus remains the same: quality craftsmanship, clear\ncommunication, and on-time delivery.\nI take pride in running organized, efficient projects with strong quality control standards and thorough documentation. \nClients appreciate my proactive communication style. I keep you informed every step of the way, ensuring there are no surprises and that expectations are consistently met or exceeded.\n\nWhether you’re planning a renovation, addition, or new build, I am committed to driving the\nschedule, protecting your investment, and delivering results you can stand behind for years to come. Let’s build it right the first time.

Avatar for 1st Response Plumbing
1st Response Plumbing
4.6(
22
)

Serving Tekoa, WA and surrounding areas

In business since 2009

Emergency services offered

Credit card accepted

"Tim was very quick to respond as he was there soon after the flood.  He was very professional in helping us determine what needed to be done, and then executed it all without a hitch.   As mentioned previously,  he took the time and had the tools and skills to make a big mess clean once again.   The finished basement was completely cleaned up. He also worked well with our renters.   Very efficient and gave us a good price for the work.  Thanks to him and his company."
Spokane Plumber
Recommended by93%of homeowners
Avatar for KMJ Construction
KMJ Construction
5.0(
7
)

Serving Tekoa, WA and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"Dianne J 3/30/20 review: I had a huge project of yard CLEAN UP, laying weed block, rock & mulch, installing 2 gates and mending fence. Justin was very accommodating and his crew was awesome. A job well done and timely. I've had many compliments. I highly recommend."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+124

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Tekoa, WA and surrounding areas

In business since 2006

Credit card accepted

"It was fine. The original design didn’t meet my needs based on the information I provided them. However, they revised the plans which worked out better for me. They were able to get the first draft to me pretty quickly."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
R&E Construction
3.7(
6
)

Serving Tekoa, WA and surrounding areas

Free estimates

Sole proprietor with over 22 years experience. We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We have many years of experience to give you confidence that we are your number one choice for your next home project. You will find us to be competitively priced with close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Showing 1-10 of 24
Basement Remodel questions, answered by experts

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

The Tekoa, WA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.