"We hired Jeff to add an egress window to our basement. He was very professional, communicated throughout the process and did an excellent job. We're very pleased with the work and would hire Jeff again for other projects."
"We had Steve build a bar in our basement and it was stunning! The attention to detail was incredible down to the wood pieces selected and matching the grain. You can tell he puts a lot of passion and intention into his work."
"@font-face { font-family: "Times New Roman"; }@font-face { font-family: "?????? Pro W3"; }p.MsoNormal, li.MsoNormal, div.MsoNormal { margin: 0in 0in 0.0001pt; font-size: 12pt; font-family: Times; color: black; }table.MsoNormalTable { font-size: 10pt; font-family: "Times New Roman"; }p.FreeForm, li.FreeForm, div.FreeForm { margin: 0in 0in 0.0001pt; font-size: 10pt; font-family: Times; color: black; }div.Section1 { page: Section1; } We initially hired Tim Becker to help with a little exterior repair work on our 1908 Phinney Ridge period home on the recommendation of our painter, James Thomas of PhD. Painters, who was in the midst of a extensive exterior paint job. The house is a classic box-style with some beautiful exterior wood details which we wanted to preserve and highlight. Tim worked well with our painter to get an old house ready for the final exterior painting work. He was thoughtful, knowledgeable, and on time with a very few changes of schedule. Because of the success of that work, and because of the competence and enthusiasm Tim brought to the project (small as it was), I then hired him to work with to me design and rebuild the original entry, to more closely match the original details of the house. That project turned out really well, too, and it then made perfect sense to hire Tim to work on a re-design of the outdoor and garden lighting. Working together, we came up with a unique solution to the challenge of providing outdoor security lighting which also is aesthetically pleasing, and highlights our developing side garden. Tim was trustworthy, good-natured and easy to work with. Drawing on a wide breadth of knowledge, Tim was able to come up with creative, cost effective solutions that I had not considered. In short, he offered options that saved money. Tim’s willingness and skill at developing a realistic budget at the very early stages of the project development - sort of a bare minimum needed to get us there - was very reassuring and freeing, as it later allowed us to feel comfortable about adding some upgrades in the finishing stage. Another benefit of working with Tim is that he can do both the design and construction work. He draws on many years of work in architecture and construction. Tim is a good communicator, who listened to our needs and ideas and carefully discussed with us all of our concerns. The focus was on helping us cratively and cost-effectively define the goals and put together a plan to accomplish the project. Tim brings to a project a wealth of knowledge, which he told us he acquired through over 30 years of experience in the northwest, especially work on older homes with all their eccentricities. Tim takes great delight in problem solving design and construction challenges on older homes. In his work, Tim was thoughtful and conscientious, and brought a mix of humor and serious problem-solving skills to the project. He interacted well with the children of the household, too. It was overall the kind of experience that leaves clients satisfied and pleased with the results."
"Jason managed a large remodel at our house, including new floors, cabinets, kitchen, bathrooms, tile, fireplace, and doors. We found Jason to be knowledgeable, honest, hard-working, and pleasant to deal with. With a large project like this we were bound to run into some unexpected problems, and Jason was always willing to do whatever it took to resolve these to our satisfaction. We are extremely pleased with the final outcome and would highly recommend Jason for any remodeling or constuction project. "
"I did not go with this company, they refunded my money because I didn't like their design. I've reviewed this before. Please can you stop these requests to do a review. "
"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Foreverly Construction brings an unmatched commitment to excellence to your home maintenance project. We have over 10 years experience delivering unsurpassed professionalism, expertise, and value. We take pride in providing our customers with personalized customer service, the highest industry standards, and top quality workmanship. References available upon request. Give us a call today!
The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.
Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!
Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.
Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.
You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.
The Palouse, WA homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.