Top-rated pool table assembly pros.

Get matched with top pool table assembly pros in Seabeck, WA

There are 7 highly-rated local pool table assembly pros.

TRUSTED BY SEABECK, WA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon915
    Verified pool table assembly services reviews

Find Pool table assembly pros in Seabeck

Avatar for Toolbox Dispatch, LLC

Toolbox Dispatch, LLC

Based In
1.00(
1
)
Approved Pro

Toolbox Dispatch, LLC

Based In
1.00(
1
)
Approved Pro
92 local quotes requested
1 years of experience

At Toolbox Dispatch, we understand the importance of a well-maintained home or workplace, and we are here to ensure that every project, big or small, is completed to your utmost satisfaction. Whether it’s a repair, installation, minor renovation, or general maintenance task, you can trust our experienced team to handle it with expertise and efficiency.

"The refurbishing of a master bathroom has been a nightmare. The project was rather simple: remove and replace fiberglass shower/tub enclosure, remove sheetrock and re-install new sheetrock, remove existing vanity sink and replace, install shower faucet and shower head, vanity faucet. They provided an estimate of 8 days to complete the job. It has taken many weeks and not even done adequately. It is so bad that I have to hire another contractor to pull out the shower walls and re-install new ones. They ruined it with their sloppy installation and not following instructions. When they apparently tried to fix it – it just looked worse and worse. Their plumbing sub-contractor made a big blunder and did not seal the pipe for the new tub faucet. This caused water to come through the ceiling onto the first floor and they had to replace a bunch of sheetrock in the kitchen. They removed all the towel bars in the bathroom for the new sheet rock but somehow managed to lose one…and came up with a BS story that there was only one in there. That didn’t fly so the story changed to that it had to be destroyed when the sheetrock was removed. Another BS story as we were in the house when this happened and would have seen it being carried out. The mudding of the bathroom was sloppy, see photo of the light switch. The caulking is even worse – much of it is missing or just very poorly applied. That all had to be removed and re-done. There are too many other issues to list but we’ll be spending another $4,400 to fix the mess they left. I urge you to learn from our encounter and avoid them – it was NOT a professional job, the staff were mostly untruthful and often rude."

Heather G on November 2025

At Toolbox Dispatch, we understand the importance of a well-maintained home or workplace, and we are here to ensure that every project, big or small, is completed to your utmost satisfaction. Whether it’s a repair, installation, minor renovation, or general maintenance task, you can trust our experienced team to handle it with expertise and efficiency.

"The refurbishing of a master bathroom has been a nightmare. The project was rather simple: remove and replace fiberglass shower/tub enclosure, remove sheetrock and re-install new sheetrock, remove existing vanity sink and replace, install shower faucet and shower head, vanity faucet. They provided an estimate of 8 days to complete the job. It has taken many weeks and not even done adequately. It is so bad that I have to hire another contractor to pull out the shower walls and re-install new ones. They ruined it with their sloppy installation and not following instructions. When they apparently tried to fix it – it just looked worse and worse. Their plumbing sub-contractor made a big blunder and did not seal the pipe for the new tub faucet. This caused water to come through the ceiling onto the first floor and they had to replace a bunch of sheetrock in the kitchen. They removed all the towel bars in the bathroom for the new sheet rock but somehow managed to lose one…and came up with a BS story that there was only one in there. That didn’t fly so the story changed to that it had to be destroyed when the sheetrock was removed. Another BS story as we were in the house when this happened and would have seen it being carried out. The mudding of the bathroom was sloppy, see photo of the light switch. The caulking is even worse – much of it is missing or just very poorly applied. That all had to be removed and re-done. There are too many other issues to list but we’ll be spending another $4,400 to fix the mess they left. I urge you to learn from our encounter and avoid them – it was NOT a professional job, the staff were mostly untruthful and often rude."

Heather G on November 2025


BartonHeating, LLC

1908 VISTA LN W
5.00(
5
)
Approved Pro

BartonHeating, LLC

1908 VISTA LN W
5.00(
5
)
Approved Pro
19 local quotes requested
13 years of experience

We provide results, not excuses! We pride our company on customer service, professionalism, great communication, efficiency, and superior quality work. We are experts in our trade and will do our best to keep you as educated as we can on your project. We look forward to earning your business! Feel free to give us a call today!

We provide results, not excuses! We pride our company on customer service, professionalism, great communication, efficiency, and superior quality work. We are experts in our trade and will do our best to keep you as educated as we can on your project. We look forward to earning your business! Feel free to give us a call today!


Avatar for Epsilon Enterprise

Epsilon Enterprise

No reviews yet

Epsilon Enterprise

No reviews yet
1 years of experience

We specialize in remediation and restoration. Flooring, painting, vanity and toilet install, shower, trim is just some of the work we have done. Please give us a call at 360-498-7415.

We specialize in remediation and restoration. Flooring, painting, vanity and toilet install, shower, trim is just some of the work we have done. Please give us a call at 360-498-7415.


Avatar for vardo

vardo

No reviews yet

vardo

No reviews yet
1 years of experience

Fifteen years in construction and remodel, I started my own business focusing on small house remodel. Electrical plumbing as well. I do everything from demo to drywall and finish work. Replace windows and doors. Fix and repair interior doors and everything in between!

Fifteen years in construction and remodel, I started my own business focusing on small house remodel. Electrical plumbing as well. I do everything from demo to drywall and finish work. Replace windows and doors. Fix and repair interior doors and everything in between!



Avatar for Pacific Tradesman

Pacific Tradesman

5.00(
1
)

Pacific Tradesman

5.00(
1
)
2 years of experience

Pacific Tradesman is a Bremerton based handyman service that specializes in maintenance, repair, assembly and installations. Our services adhere to industry standards, providing our clients with confidence, and extending the intervals between required maintenance. Additionally, we provide complimentary service schedules to enable you to manage your home’s needs and your finances. We look forwarded to working with you!

Pacific Tradesman is a Bremerton based handyman service that specializes in maintenance, repair, assembly and installations. Our services adhere to industry standards, providing our clients with confidence, and extending the intervals between required maintenance. Additionally, we provide complimentary service schedules to enable you to manage your home’s needs and your finances. We look forwarded to working with you!





...
Showing 1-10 of 201
Pool Table Assembly questions, answered by experts

In-ground pools are more durable and have a longer lifespan, but aboveground pools are an excellent option for homeowners on a budget. Aboveground pools are also easier to remove if you no longer want to maintain one.

The cost of an aboveground pool is $800 to $5,000 for materials and $1,000 to $3,000 for labor. Before deciding, weigh the pros and cons of each pool.

A good rule of thumb is to add one or two 40-pound bags of salt for every inch of rain, but you’ll want to test your salt levels first to ensure you’re adding the right amount. Rainwater can dilute the salt levels in your pool, so after significant rainfall, test the levels and add the appropriate amount of salt to bring it back to the ideal level.

The best time to schedule an annual pool inspection is early or late spring, before the busy summer season. Your inspector can identify urgent issues so you can address them before using the pool. If your region is warm year-round, schedule an inspection before you start swimming regularly. 

It is possible to restore a filled-in pool. If you want to dig up and repair a filled-in pool in your backyard, the process will cost about the same as the cost of installing a new in-ground pool. You might do this if the filled-in pool is causing sinking, swelling, or drainage issues in your yard. A new pool may resolve these problems and increase your property value.

If you don’t bond a pool, you risk electric shock for those walking around or swimming. Bonding creates safe pathways between the electricity needed to run the pool and metallic parts also necessary for the proper function of the pool. Once the pool is bonded, it’s ready for grounding, the second step in creating an electrically safe pool.

The Seabeck, WA homeowners’ guide to pool table assembly services

From average costs to expert advice, get all the answers you need to get your job done.