Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Packwood, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Packwood, WA?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Packwood

Avatar for Cover Pro Painting
Cover Pro Painting
4.1(
56
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Packwood, WA and surrounding areas

In business since 2004

Free estimates

Credit card accepted

"It went great!! Harry Wheeler is amazing! I needed this done as soon as possible when I contacted him and he made it happen. I needed these repairs done to sell my home and he came through for me. The price was more than I had anticipated, but the service he provided was well worth the price."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+60

Recommended by87%of homeowners
Avatar for Precision Tile
Precision Tile
4.0(
4
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Packwood, WA and surrounding areas

Emergency services offered

"Edgar and his crew did a fantastic job of remodeling our 69 year old bathroom! Communication was great and the job was completed in the time frame he stated. The upgrade from a cast iron bathtub to a tile walk in shower is amazing! Don't hesitate, hire Precision Tile and Home Remodel to do your remodel today!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+93

Recommended by100%of homeowners
Avatar for Scatter Creek Construction, LLC
Scatter Creek Construction, LLC
4.1(
30
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Packwood, WA and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"The project included a purchase of a new fireplace and a remodel of the mantel and fireplace surround.  I contracted with Jake of Scatter Creek Construction earlier in the year for a roofing repair/remodel and was highly satisfied with the project. This project required three phases. First the removal of the old mantel and surround as well as the preparation for removal of the old fireplace.  The second phase was the installation of the new fireplace.  The third was remodel of the fireplace wall including a mantel, tile surround, and box insert for the multimedia center.    Scatter Creek was contracted for phase 1 and 3.  A local fireplace retailer handled phase 2.  Jake and I met to review the conceptual design and plan the work.  He explained the work breakdown structure, sequence of events, and the expected time frames to complete the different work activities.   The primary materials needed were to select the type of tile for the fireplace surround and the wood type and design for the mantel shelf.  I did most of my research on the web, went to local home improvement stores to view the tiles and mantels we had in mind, and sent pictures and web links to Jake for him to provide the bid. He estimated that the project work would take less than a week to complete. Jake was hard to get hold of and, when I questioned if he was interested in the project, he finally got back to me. Because of the delay in getting the bid finalized we missed an opportunity for the fireplace installer consequently delaying the project for 25 days.  I removed all the furnishings in the room except for the couch and love seat, which Jake offered to move.  When Jake arrived for the room prep he was not equipped to move the furniture but covered it instead.  My wife fretted over the furniture for the duration of the project. Jake was responsible for the fireplace removal prior to the fireplace installation.  When the fireplace installer arrived the fireplace hadn't been removed.  Fortunately the fireplace retailer worked with us and convinced his installer to remove the old unit for an additional price.  Jake offered an apology and covered the costs but did not provide a good reason for the mix up.  The wall construction and tiling was dirty work and although Jake cleaned up some at the end of each day there was still a considerable amount of dust throughout the house.  At one point I had to inform Jake that the dirt left on the brand new fireplace during the tile and grout work left me pretty frustrated with the process.  The job also took three weeks to complete which didn't seem unreasonable considering the work performed but definitely was disappointing for my wife who felt she was promised one week to complete. At the conclusion of the project the outcome came out just as I had visualized and what Jake had convinced me he could do in his proposal.  I thought the pricing was fair, the craftsmanship was superior, and we are enjoying our remodeled living space.   Although the outcome was a success, the process had it's flaws with miscommunications, an over promise and under delivery on completion date, and at times the poor condition of the area of the house being worked on."
Before.
After.
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by84%of homeowners
Vlad Western Tile Inc
New to Angi
Tile: Ceramic and Porcelain - Repair

Serving Packwood, WA and surrounding areas

In business since 2020

Free estimates

Emergency services offered

Vlad Western Tile Inc is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Showing 1-10 of 28
Ceramic Tile questions, answered by experts

When tiling over concrete, you should install an anti-fracture membrane after the concrete has been prepared. The anti-fracture membrane acts as a moisture barrier and should be installed to protect the tiles from moisture which helps maintain their integrity. Often, Ditra, a brand name, is used interchangeably with moisture barrier.

Replacing tile flooring can take a few days for a pro, but larger rooms will need more time. It takes eight to 12 hours for a tiling pro to remove old grout and tiles across 100 square feet. Then, it will take about four hours to prep the subfloor for tiles and another eight to 10 hours for a pro to install new tiles. Your tiling project may take up to a week, depending on the size of the room.

Different types of tile cutters may work best depending on the type of tile you are cutting and the size of your project. There are two main types of tile cutters: manual and electric. Manual tile cutters are quick and easy to use for small projects and softer tile materials, but they can only make straight cuts. Electric tile cutters make light work of big projects and can cut through harder materials.

Yes, it’s always a good idea to keep a box or two of spare tiles after a home renovation project. Tiles can crack from improper installation, heavy foot traffic, and impact from drops. Having some extra tile on hand can make replacement fast, easy, and affordable. Plus, some manufacturers might discontinue particular colors or styles, and slight variations in tile colors between batches could mean mismatched tiles even if your product isn’t discontinued. Having a few spare tiles in storage can help avoid these issues, as well.

Penny tile should be sealed to protect the grout from moisture and keep stains from damaging the look of the tile. If penny tile is in a humid or high-traffic area, like a bathroom, kitchen, or entryway, it needs sealant. Any type of tile and grout is best maintained with a sealant reapplied by a pro every one to two years.

The Packwood, WA homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.