Top-rated asphalt driveway pros.

Best asphalt driveway pros near Mount Vernon, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Mount Vernon, WA?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Mount Vernon - Updated Nov 2026

Near Me Roofing Company
5.0(
74
)
Asphalt Paving - Repair or PatchBrick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Mount Vernon, WA and surrounding areas

Approved

In business since 2012

Free estimates

Credit card accepted

"Excellent service and very thorough with explanation and getting the right. I researched many skylight installation companies and decided to hire Ari and Elijah. I will recommend my colleagues and friends and family. I will absolutely use this roofing company for any roof work on my house."
Response time4 days
Recommended by80%of homeowners
Avatar for Blessed Land
Blessed Land
4.3(
64
)
Concrete Driveways - Install

Serving Mount Vernon, WA and surrounding areas

Approved

In business since 2005

Free estimates

Emergency services offered

"We have hired them twice, for trimming and pruning everything on our property, including a stand of 12 tall arborvitae, a large ground cover area, and several fast-growing evergreen trees. Their work was excellent and affordable, and they showed up on time and worked hard. We are very pleased with the results, and we will use them again."
Paver Stairs and Steps
Paver Stairs and Steps
Paver Stairs and Steps
Circle Paver Area
Wood Fence

+16

Response time8 hrs
17 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Ground Effex Asphalt
Ground Effex Asphalt
4.3(
154
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Paving - Install- For Business

Serving Mount Vernon, WA and surrounding areas

Approved

In business since 2005

Free estimates

Warranties offered

"I was amazed by how quickly they removed the old driveway and then laid down the new. I didn't really want to have to replace the driveway but a hole formed right in the middle and forced the issue. They found the source of the sink hole, fixed it and replaced the driveway."
Overlay
New driveway
Roller
Everett overlay
New driveway

+14

Response time12 hrs
7 neighbors recently requested a quote
Recommended by89%of homeowners
...
Showing 1-10 of 145
Asphalt Driveways FAQs, answered by experts

Instead of a set number of types, asphalt comes in variations designed for different needs. Some are categorized by temperature—hot mix, warm mix, and cold mix. Others are sorted by composition, like dense-graded, gap-graded (such as Stone Matrix Asphalt), porous, and mastic asphalt. There are also modified versions with added compounds like polymers, rubber, or emulsions. Instead of focusing on a number, it may be more useful to understand how contractors customize asphalt for durability, climate, and traffic conditions.

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

The Mount Vernon, WA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.