Top-rated basement remodelers.

Get matched with top basement remodelers in Lacey, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Lacey, WA?

Select your specific project to find the pro for you.

Find Basement remodelers in Lacey

Avatar for NW TOPNOTCH REMODEL LLC
NW TOPNOTCH REMODEL LLC
5.0(
15
)
Basement - Remodel

Serving Lacey, WA and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"The guys were always on time, and they finished a couple days before the estimate time frame they work fast and efficient and i couldn't be happier with the final results. I believe their prices are very competitive and the quality of their work is top notch"
Paint
Remodel
Exterior Repaint
Repaint
Kitchen Flooring

+95

Response time8 hrs
Response rate88%
1 neighbors recently requested a quote
Avatar for KOI BUILD CO
KOI BUILD CO
4.8(
19
)
Basement - Remodel

Serving Lacey, WA and surrounding areas

Approved

In business since 2017

Free estimates

Warranties offered

"Awesome team they worked on our vacant house and remodeled it before move in , checked in everyday after hours and their team always took the time to clean and organize before they left for the day .final product was great and pricing was very fair vs other contractors, would definitely recommend chris and the team again and again !!!"
Puyallup Remodel
Puyallup Remodel
Puyallup Remodel
Puyallup Remodel
Family Room

+164

Response time1 day
91 neighbors recently requested a quote
Recommended by60%of homeowners
Avatar for Opportunity Construction LLC
Opportunity Construction LLC
4.7(
20
)
Basement - Remodel

Serving Lacey, WA and surrounding areas

Approved

In business since 2002

Free estimates

Credit card accepted

"I highly recommend Opportunity Construction, 100%! I had my carpets replaced with vinyl plank, new trim, interior doors, my master bath & full guest bath gutted & remodeled. Dean and his crew did amazing work, were very honest, detailed, friendly & cleaned up after themselves every single time, all for very a reasonable price. I am 100% satisfied with the work they did. I will definitely be calling Dean again for my future plans. Thank you, again!!"
27 neighbors recently requested a quote
Recommended by78%of homeowners
Bedrock Construction Services LLC
5.0(
5
)
Basement - Remodel

Serving Lacey, WA and surrounding areas

Approved

In business since 2023

Free estimates

Offers commercial services

"The Bedrock team was awesome! Did a terrific job. On time. Most important to me is that they were trustworthy and I felt very confident with them alone in my house. This is the second time Jake has been to my house- the other project was installation of a new wall and door to partition a room off. Also excellent work! Highly recommend!!!"
Response time2 days
Response rate87%
8 neighbors recently requested a quote
...
Showing 1-10 of 186
Basement Remodel questions, answered by experts

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

The Lacey, WA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.