Top-rated excavation pros.

Get matched with top excavation pros in Bedford, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Bedford, VA?

Select your specific project to find the pro for you.

Find Excavation pros in Bedford

Avatar for JP Excavating & Construction LLC - Pgina inicial  Facebook
JP Excavating & Construction LLC - Pgina inicial Facebook
New to Angi

Serving Bedford, VA and surrounding areas

In business since 2014

Free estimates

Credit card accepted

JP Excavating & Construction, LLC, works hard to provide the highest quality workmanship and customer service on every job we are awarded. With many years in this field we look forward to service all your home improvement needs.

excavating
forestry mulching
new construction rough in
driveway
Response time5 days
Mitchell's Excavating
New to Angi

Serving Bedford, VA and surrounding areas

In business since 2013

Free estimates

With years of experience serving the area, we are your solution for all your excavation needs. We take great pride in our extreme professionalism, timeliness and superior customer service on every job. We make sure to develop a lasting relationship so that the next time service is needed there will be no question on who to call. Check out our 5 star reviews from happy customers! Call us today so we can discuss your needs and make a plan that fits your budget. Satisfaction guaranteed!

Showing 1-10 of 28
Excavating questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Maintain open communication and address issues as they arise, ensuring contract terms cover potential delays.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

The Bedford, VA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.