Top-rated excavation pros.

Get matched with top excavation pros in Thaxton, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Thaxton, VA?

Select your specific project to find the pro for you.

TRUSTED BY THAXTON, VA HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon18
    Verified excavation services reviews

Find Excavation pros in Thaxton

Benjamin Bear Associates / O.L. TURNER & Sons Inc.
3.5(
25
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Thaxton, VA and surrounding areas

In business since 1968

Emergency services offered

"He showed up on time but, didn't get done what I wanted done in the time that I bought from the big deal. I think it should have taken him two hours. It was easy to schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by58%of homeowners
John Dooley Excavating
1.3(
2
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Thaxton, VA and surrounding areas

In business since 1995

Free estimates

Credit card accepted

John Dooley Excavating is your local excavation contractor. We also specialize in septic tank systems cleaning, inspection, and installation. We provide all kinds of excavation projects including land cleaning, grading and much more. Each project is unique and custom tailored to your specific needs.

Response time2 hrs
Apex Earthworks
5.0(
1
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Thaxton, VA and surrounding areas

"Ive had my driveway "fixed" by a couple of different companies over the years and it never lasted — washouts, ruts, standing water, the same problems creeping back within a season. Apex Earthworks actually diagnosed why it kept failing instead of just patching the surface again. They regraded it properly and addressed the drainage, not just the driveway itself. It's been solid through everything since, no ruts, no washouts, no puddles. What stood out most was that Gaige and his Crew clearly know what they're doing — this isn't guesswork, it's actual expertise in grading and drainage. They showed up when they said they would, and cleaned up the site when they were done. After years of paying other people to "fix" my driveway, it's a relief to have it actually done right the first time. I will recommend Apex Earthworks to everyone!! Thank you Gaige!! Your professionalism speaks volumes!!"
Showing 1-10 of 27
Excavating questions, answered by experts

A walk-behind trencher can cut through roots as long as they’re not too thick, making a project much easier than digging with a shovel and other hand tools. Assess your terrain and the number of trees in the surrounding area to determine if a walk-behind trencher will ease the job. Digging a trench by hand is much more time-consuming and labor-intensive. 

Yes, professional installations include trenching or borehole drilling required for ground loops.

Chipmunks dig their burrows about three feet deep and up to 30 feet long. The entrances can be two inches wide or more. Chipmunks are fiercely protective of their burrows and use them to protect the nuts and seeds they gather for the long winters.

Trenching is a specific kind of digging. Trenching means digging a depression in the earth that’s deeper than it is wide, often with heavy machinery. Digging refers to any kind of removal of earth in order to create a human-made depression, hole, or cut in the earth’s surface. You can dig with big tools or even with just a hand shovel.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Thaxton, VA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.