Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Pleasant Grove, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Pleasant Grove, UT?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Pleasant Grove

Avatar for David Trail
David Trail
4.9(
79
)
Asphalt Sealing

Serving Pleasant Grove, UT and surrounding areas

Approved

In business since 1972

Free estimates

Small jobs welcome

"The David Trail team did an excellent job on our house trim painting â great work and great communication throughout this project. Highest recommendation for this company."
Response time5 hrs
Response rate93%
3 neighbors recently requested a quote
Avatar for MLI MORENO LANDSCAPE LLC
MLI MORENO LANDSCAPE LLC
5.0(
14
)
Interlocking Pavers for Driveways & Floors - Install

Serving Pleasant Grove, UT and surrounding areas

Approved

In business since 2022

Free estimates

Offers commercial services

"Cesar did an awesome job! He removed three large concrete footings left from some old fence posts, and then installed three new 4x4 fence posts with new concrete footings. He gave me a bid, started that same day, and then finished on the second day. I couldn't have been more pleased. He works hard, is honest and reliable. Thank you Cesar!"
5 neighbors recently requested a quote
...
Showing 1-10 of 296
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

The Pleasant Grove, UT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.