Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Park City, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Park City, UT?

Select your specific project to find the pro for you.

TRUSTED BY PARK CITY, UT HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon12
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Park City

Avatar for Evia Concrete LLC
Evia Concrete LLC
5.0(
23
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Park City, UT and surrounding areas

Approved

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"Evia Concrete LLC performance was outstanding. They made suggestions to increase the over appearance of both the fence and yard. The decorative stamp turned out great. They were easy to work with, I’d hire them again for a future project."
Concrete Driveways Project
Concrete Pouring and Repair Project
Driveways - Concrete Project
Concrete - Pouring & Repair Project
Patios Project

+117

Response time2 days
4 neighbors recently requested a quote
Recommended by82%of homeowners
Avatar for Pippen Brick & Tile, LLC
Pippen Brick & Tile, LLC
4.9(
42
)
Concrete Driveways - InstallBrick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For Business

Serving Park City, UT and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"Noel is hard-working, diligent, and honest. He and his crew did great work tearing down and building a brick wall. He was also responsive before and during the entire project. I would highly recommend him and his company for any project."
Response time1 day
2 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for David Trail
David Trail
4.9(
80
)
Asphalt Sealing

Serving Park City, UT and surrounding areas

Approved

In business since 1972

Free estimates

Small jobs welcome

"The David Trail team did an excellent job on our house trim painting â great work and great communication throughout this project. Highest recommendation for this company."
Response time5 hrs
Response rate93%
7 neighbors recently requested a quote
...
Showing 1-10 of 251
Asphalt Driveways questions, answered by experts

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

The Park City, UT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.