Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Lindon, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Lindon, UT?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Lindon

Avatar for Utah Valley Landscaping
Utah Valley Landscaping
4.9(
27
)
Concrete Driveways - InstallInterlocking Pavers for Driveways & Floors - InstallConcrete Driveways & Floors - Install- For Business

Serving Lindon, UT and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2008

Free estimates

Warranties offered

"Alex, Antonio, and Francisco were amazing. Alex figured everything out for me and my budget, and the 2 guys did this huge driveway job. It looks amazing. Alex is such a great guy. I recommend this company to anyone, and everyone. If you keep the communication open you won't regret it."
Front yard Landscape
Pool with Slide and waterfall
Backyard Landscape
Backyard Pool
Garden Area

+12

Response time1 day
Response rate99%
180 neighbors recently requested a quote
Avatar for David Trail
David Trail
4.9(
79
)
Asphalt Sealing

Serving Lindon, UT and surrounding areas

Approved

In business since 1972

Free estimates

Small jobs welcome

"David and his crew paid close attention to detail and did an excellent job when painting two garages and a shop building. They also put a shingle preservative on the roofs. The price was reasonable and the service outstanding. I'm very pleased with the results and highly recommend David for any project you may have."
Response time5 hrs
Response rate93%
3 neighbors recently requested a quote
Avatar for JCR General Contractor, LLC
JCR General Contractor, LLC
5.0(
14
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Lindon, UT and surrounding areas

Approved

In business since 2019

Free estimates

Offers commercial services

"I appreciate that they always came when they said they were going to. They did a great job at pouring a concrete pad to extend our driveway and relocate our basketball hoop. I would definitely recommend them"
Basketball court
Basketball court
Basketball court
Basketball court
Basketball court

+537

Response time9 hrs
Response rate89%
Recommended by85%of homeowners
Avatar for E&J Landscaping LLC
E&J Landscaping LLC
4.6(
14
)
Brick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Lindon, UT and surrounding areas

Approved

In business since 2020

Emergency services offered

Warranties offered

"Erik and his team performed well and on time. He is professional, meets you at scheduled appointments, follows up with bids/estimates, and is well prepared. Most importantly, he is honest and trustworthy and keeps close to the bid and explains all additional costs necessary for the job. The job site is always clean and all workers very respectful and polite. He has done multiple jobs because we trust he will do a good job and charge fairly. It is without hesitation that we recommend his company. J and E"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+109

Response time2 days
Response rate94%
4 neighbors recently requested a quote
Avatar for MLI MORENO LANDSCAPE LLC
MLI MORENO LANDSCAPE LLC
5.0(
14
)
Interlocking Pavers for Driveways & Floors - Install

Serving Lindon, UT and surrounding areas

Approved

In business since 2022

Free estimates

Offers commercial services

"Cesar did an awesome job! He removed three large concrete footings left from some old fence posts, and then installed three new 4x4 fence posts with new concrete footings. He gave me a bid, started that same day, and then finished on the second day. I couldn't have been more pleased. He works hard, is honest and reliable. Thank you Cesar!"
4 neighbors recently requested a quote
...
Showing 1-10 of 292
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Lindon, UT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.