Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Elk Ridge, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Elk Ridge, UT?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Elk Ridge

JH Concrete & Exteriors, LLC
5.0(
13
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Elk Ridge, UT and surrounding areas

Approved

In business since 2025

Free estimates

Offers commercial services

"I got three quotes, and they were very competitively priced. They completed the work quickly and did an excellent job cleaning up afterward. The new concrete matched our existing concrete perfectly, and the finished driveway looks great. I would definitely hire them again. In fact, after seeing how good our driveway turned out, our neighbors hired them and they’re working on their house now."
Pickle ball court
Pickle ball court
Pickle ball court
Pickle ball court
Back patio and driveway

+10

14 neighbors recently requested a quote
Avatar for JCR General Contractor, LLC
JCR General Contractor, LLC
5.0(
14
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Elk Ridge, UT and surrounding areas

Approved

In business since 2019

Free estimates

Offers commercial services

"I appreciate that they always came when they said they were going to. They did a great job at pouring a concrete pad to extend our driveway and relocate our basketball hoop. I would definitely recommend them"
Basketball court
Basketball court
Basketball court
Basketball court
Basketball court

+537

Response time9 hrs
Response rate89%
1 neighbors recently requested a quote
Avatar for Affordable Asphalt & Coatings
Affordable Asphalt & Coatings
4.6(
18
)
Asphalt Sealing

Serving Elk Ridge, UT and surrounding areas

Approved

In business since 1990

Free estimates

Small jobs welcome

"They were very careful and did not spray anything but the driveway. They did a double coat. The driveway looks great and got the oil-based coat that was sorely needed!"
Response time3 days
20 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for SOF Concrete construction
SOF Concrete construction
5.0(
12
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Elk Ridge, UT and surrounding areas

Approved

In business since 2000

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer’s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

RV parking
RV parking
Patios
Patios
Patios

+349

9 neighbors recently requested a quote
Recommended by100%of homeowners
Commodore Construction, L.C.
4.7(
5
)
Concrete Driveways - InstallConcrete Driveways & Floors - Install- For Business

Serving Elk Ridge, UT and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"Jake and his team came promptly and eventhough my project challenged them a bit, they persisted and worked hard to complete my project that day, as snow began to fall and the temperature fell 20 degrees! They were amazing and did a perfect job! We are so happy with the result! I would recommend them highly to all my friends and neighbors!"
Response time8 hrs
Response rate97%
8 neighbors recently requested a quote
...
Showing 1-10 of 217
Asphalt Driveways questions, answered by experts

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

The Elk Ridge, UT homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.