"Beat all the local San Angelo bids by a mile and brought material all the way down from Lubbock. Paved my driveway then chip set a 2 1/2 mile road for me. Fast service and good quality. Came back to repair one minor problem on the chip set road a month later. Nice work, good people."
"They were awesome. I had an oddball sized garage door and they were able to locate and install a new one, add a lift motor, replace all of the channeling and add an outside entry keypad. Now I'm able to park the cars inside once again. "
"Omar and his team did a phenomenal job installing a stair rail. He was professional and the job was completed in one day. Rail looks really nice and itâ s sturdy. Thank you Boss Tex welding."
"Great service, very fast to get the work completed this LLC is honestly just the way to go. My metal shed was fabricated and built within a few days and absolutely nothing was left behind. Clean, reliable, good work."
We�re a locally owned and operated company that values honesty and integrity, and stands behind our work. We specialize in asphalt paving. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building long-term relationships with our clients and guarantee your satisfaction!
Blacktop seal coat driveways business parking lots ETC we do it all pot holes fills Speedbumps handicap stickers stripes crack filling cleaning got you covered been in business 50 years plus\nProfessional Nice everything\n\n(You serve it will pave it)
Overall, a paver driveway is considered the easiest to maintain because homeowners are able to do driveway repair one piece at a time without impacting the rest of the driveway. Unlike paved options, paver driveways contain individual stones that aren't physically connected. By comparison, you may need to reseal or redo a full asphalt driveway if just one portion sustains a significant crack.
It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting.
Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.
Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.
Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.
The Wellington, TX homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.