Top-rated excavation pros.

Get matched with top excavation pros in Sandia, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Sandia, TX?

Select your specific project to find the pro for you.

Find Excavation pros in Sandia

Avatar for Baird Foundation Repair
Baird Foundation Repair
4.5(
90
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Sandia, TX and surrounding areas

In business since 1969

Free estimates

Credit card accepted

"Great experience with a very professional crew. The work of fixing my front sidewalk and driveway was completed quickly, on time, and looks great now! Thanks to Jackie and Ryan, who did the repair work. They were friendly, efficient, and quickly completed all the work needing to be done. They answered all my questions. I would go to Baird Foundation Repair without hesitation for any future foundation or concrete work, if the need develops. I'll be recommending Baird to all of my neighbors and friends. Oh, and the cost of the work being done actually came in a little under what I was expecting, which was a very nice surprise!"
Additional Photos
Separation between Ceilings and Walls
Cracks in Doorways
Stair Step Cracking on Exterior
Before

+4

Recommended by88%of homeowners
...
Showing 1-10 of 57
Excavating questions, answered by experts

There is no standard depth for burying a septic tank; they are typically buried anywhere from 4 inches to 4 feet underground. The final depth depends on several factors, including the depth of your main sewer line, the height of the bedrock, soil type, local regulations, and the property's landscape. If you plan to grow grass or plants over the tank, a depth of at least 4 to 6 inches is recommended. Deeper tanks can be more difficult to locate, but a septic professional can help find it for you.

Most professional excavation teams will charge between $8 and $15 per cubic yard. Calculate the cost by finding the volume of your pool—width x length x depth—and dividing it by 27. Then, multiply the price by the cubic yards from your equation. Budget for complications like a rocky lawn, hard-to-access pool area, or high local labor prices.

Yes, trenchers can go through gravel. Gravel is made up of smaller, softer rocks that certain trenchers are able to cut through. Just be sure to use a rock wheel trencher or chain trencher, both of which are made to cut through rocky landscapes and gravel pathways without dulling the teeth or chain.

While you can save some money by digging your own pool, you may end up paying more in construction equipment rental fees in the long run. You could, however, focus your DIY energies on lowering the cost of leveling your lawn for your pool or filling in surrounding landscaping after construction.

There are many ways to cut through roots when digging, especially if your trencher doesn’t seem to be removing the roots. First, use a shovel to expose the roots. Then, use gardening shears to clear out smaller roots or a reciprocating saw to remove larger plant roots. If you plan on keeping the plant, avoid cutting any roots over 2 inches thick.

The Sandia, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.