Top-rated excavation pros.

Get matched with top excavation pros in Sandia, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Sandia, TX?

Select your specific project to find the pro for you.

Find Excavation pros in Sandia

Avatar for Baird Foundation Repair
Baird Foundation Repair
4.5(
89
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Sandia, TX and surrounding areas

In business since 1969

Free estimates

Credit card accepted

"Great experience with a very professional crew. The work of fixing my front sidewalk and driveway was completed quickly, on time, and looks great now! Thanks to Jackie and Ryan, who did the repair work. They were friendly, efficient, and quickly completed all the work needing to be done. They answered all my questions. I would go to Baird Foundation Repair without hesitation for any future foundation or concrete work, if the need develops. I'll be recommending Baird to all of my neighbors and friends. Oh, and the cost of the work being done actually came in a little under what I was expecting, which was a very nice surprise!"
Additional Photos
Separation between Ceilings and Walls
Cracks in Doorways
Stair Step Cracking on Exterior
Before

+4

Recommended by88%of homeowners
...
Showing 1-10 of 57
Excavating questions, answered by experts

The average cost for pool excavation is $2,500. This cost can range from $450 to $4,500, depending on the pool shape and size, time of year, and any need to move buried utilities. 

When excavating for your pool, you might have to move existing utilities. You can expect to pay an additional $15 to $25 per linear foot to move gas lines. To move a septic system, it’ll cost an additional $2,000 to $20,000. A pool that is 10 feet by 12 feet averages $450 to excavate, and a 20-foot-by-40-foot pool averages $3,020.

Excavations take a few days or up to a few weeks. The time it takes to excavate an area depends on the size of the area, the type of soil, the type of excavator, and even the time of year, since winter can make digging up the ground more difficult.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The rules for trenching and excavation include setting up and following safety protocols, learning how to use tools and machines properly, and ensuring there is a safe exit for all workers. Keep heavy equipment and materials away from the edge of the hole or trench. Call the 811 dig line before starting any excavation or trenching project to ensure you don’t hit any electrical or gas lines.

The Sandia, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.