Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Glen Rose, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Glen Rose, TX?

Select your specific project to find the pro for you.

TRUSTED BY GLEN ROSE, TX HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon130
    Verified backsplash installation services reviews

Find Backsplash installation pros in Glen Rose

Avatar for Express Flooring Dallas
Express Flooring Dallas
4.3(
58
)

Serving Glen Rose, TX and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Credit card accepted

"Very happy with our new floor. Express Flooring made entire process very easy from our initial consultation to installation. Installer, JP did a great job, was fast, efficient and courteous."
Our Work
Our Work
Our Work
Our Work
Our Work

+90

375 neighbors recently requested a quote
Recommended by59%of homeowners
Avatar for Full Scale LLC
Full Scale LLC
5.0(
1
)

Serving Glen Rose, TX and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"Nate Davis came out on time me repaired the doors in less time than his estimate,He gave me an estimate on repairing damaged siding and repairing and painting a room the work was finished under his estimate I highly recommend him for any remodeling and repairs"
Sky Shower
Sky Shower
2 neighbors recently requested a quote
...
Showing 1-10 of 74
Backsplash Installation questions, answered by experts

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

It’s best to start with tiling the shower floor before moving on to the walls for the most visually-pleasing results. When taking on any tiling project, you’ll want the wall tiles to “sit” neatly on the floor tiles rather than overlapping them. Finishing your floor tiles first will allow you to place your wall tiles without any gaps, holes, or awkward intersections.

The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.

Poured-in-place terrazzo flooring is more durable than tile. In fact, it’s one of the most durable types of flooring on the market. It can last anywhere from 40 to 100 years, depending on maintenance. On average, you can expect your terrazzo floor to last about 75 years, but you will have to make repairs as needed.

One major drawback of a concrete tile roof is that the material is heavier than most other roofing materials, so there’s a good chance you’ll need structural reinforcements for your home before you can install the roofing material. Concrete tile roofs are also twice as expensive as asphalt shingle roofs, so even though they last much longer, you’ll see higher up-front costs and lower overall value from concrete roof tiles.

The Glen Rose, TX homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.