Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Decatur, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Decatur, TX?

Select your specific project to find the pro for you.

TRUSTED BY DECATUR, TX HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon12
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Decatur

Avatar for Rockin B Land Services
Rockin B Land Services
5.0(
13
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Decatur, TX and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

"Devin did a great job explaining the process and walking through the plan for the new driveway. He was very professional and an all around good guy to work with. He completed the work in a timely manner. The finished product was exactly what we asked for! I would recommend him and his services."
Overgrown Lot
Cleared lot
Mulching overgrown lot
Response time1 day
Response rate91%
13 neighbors recently requested a quote
Avatar for Asphalt Construction
Asphalt Construction
4.9(
6
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Paving - Install- For Business+1 more

Serving Decatur, TX and surrounding areas

Approved

In business since 1994

Free estimates

Warranties offered

"Asphalt Construction of Gainesville did an outstanding job on my driveway. They transformed an old mess of ruts, gravel and chunks of concrete into an attractive and smooth solid surface. It took only two days. Buddy, his dad, and the rest of the team were punctual, professional, and great to work with. They have all the equipment necessary to do an outstanding job, and you can tell by the way they work that they have plenty of experience. They left my property looking cleaner than when they arrived, and even salvaged some existing material to create a parking pad for my RV. I have already received numerous compliments on their work, and I highly recommend them for any paving project, large or small."
Response time4 days
14 neighbors recently requested a quote
Recommended by60%of homeowners
Avatar for Inoa Construction Group
Inoa Construction Group
4.8(
16
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Decatur, TX and surrounding areas

Approved

In business since 2004

Free estimates

Credit card accepted

"Their work is immaculate ! The outdoor kitchen they built for me completely transformed my backyard. They were fast and clean, and the quality of the workmanship leads me to believe it will last longer than my house will"
Inoa Construction Group
Siding Installation
Siding Installation
New Fence
2 neighbors recently requested a quote
Recommended by60%of homeowners
...
Showing 1-10 of 304
Asphalt Driveways questions, answered by experts

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

The Decatur, TX homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.