Top-rated cabinet makers.

Get matched with top cabinet makers in Boyd, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet making project in Boyd, TX?

Select your specific project to find the pro for you.

TRUSTED BY BOYD, TX HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon53
    Verified cabinet making services reviews

Find Cabinet makers in Boyd

Avatar for Avondale Custom Cabinets
Avondale Custom Cabinets
5.0(
7
)

Serving Boyd, TX and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Avondale Custom Cabinets did an outstanding job on the new cabinets in my home. The craftsmanship is beautiful, the design is exactly what I envisioned, and the quality is truly top-notch. Their team was professional, punctual, and easy to work with throughout the entire process. They paid close attention to detail and made sure everything was installed perfectly. I highly recommend Avondale Custom Cabinets to anyone looking for high-quality, custom work done right."
New Kitchen cabinets
New Kitchen cabinets
Whole house cabinets
Whole house cabinets
Before the remodel

+1

Response time2 hrs
Response rate100%
38 neighbors recently requested a quote
Wright RE and GC, LLC
New to Angi

Serving Boyd, TX and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

We are a locally owned and operated company out of Ft Worth, Texas. We value honesty and integrity in all aspects of our business. We offer a variety of general contracting services that are customized to each individual project. We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Response time4 hrs
TEXAS CUSTOM WOOD WORKS
4.6(
26
)

Serving Boyd, TX and surrounding areas

In business since 2002

Credit card accepted

"Signed contract on April 30, 2011 Contract stated that the lead time was 10-12 weeks; Cody completed 2 small projects (pull out trash compartment and reconfigured shelves) on 6-11-11. Cody returned in July with dishwasher panel and to remeasure cabinet for bathroom and to verify changes to bedroom shelf units (addition of built-in drawers); he explained that he was running behind due to excessive summer heat & no A/C in his shop, but he'd be in touch with me. "Fast forward" to October-bathroom cabinet was completed, and on Dec 21st, the shelves, our final project, was completed.

My husband and I were pleased with each finished project. We were not pleased with the length of time it took to get the job done. I realize that he was faced with several obstacles during the process, which was unfortunate. I can not recommend Cody for large projects...possibly small projects suit him better. At any rate, we feel fortunate that our jobs were completed. If you choose to hire Cody, be prepared to test your patience."
Recommended by95%of homeowners
...
Showing 1-10 of 80
Cabinet Making questions, answered by experts

We recommend installing wall cabinets first so the base cabinets aren’t in the way. This order also prevents damage to the base cabinets if you drop tools or materials when installing the upper cabinets.

You can stack upper kitchen cabinets, but they may not fit neatly. Because upper kitchen cabinets are typically available in these standard sizes—12, 15, 18, 24, 30, 36, and 42 inches—you can stack various-sized upper cabinets. But, depending on your ceiling height, these standard sizes may not work together. That’s why smaller stacked cabinets are a much more stylish and economical choice.

While having an assistant to help ensure safety and to lend a hand is desirable, if someone isn't around to assist, you can install kitchen cabinets on your own. Normal kitchen cabinet installation starts with the upper wall cabinets. If you're working on your own, consider installing the bases first and building a temporary support structure on top of them to help you install the uppers.

Most assemblies take 1-3 hours, but larger units or those requiring wall mounting may take longer.

In a kitchen installation, starting with the foundation and structural elements before moving on to the finishing touches is essential. Framing, plumbing, and utilities should go first, followed by cabinetry and countertops, then plumbing fixtures and new appliances. Flooring, paint, tile backsplashes, and similar finishing touches should get installed last.

The Boyd, TX homeowners’ guide to cabinet making services

From average costs to expert advice, get all the answers you need to get your job done.